45% SLK - Zenith Energy

Aqualight
ZENA 26.06.2020 kl 08:29 41495

Yderligere RNS er på vej, og vi er mange der ser frem til hvilke aftaler AC har lukket, jeg er stadig overbevist om at Talipia ll andelen er forhandlet bedre for firmaet. SLK aftalerne kan blive meldt underskrevet hvert øjeblik. Yderligere opdateringer fra samarbejder med Fleet.

Aqualight 🇩🇰🇳🇴
Redigert 17.03.2021 kl 16:25 Du må logge inn for å svare
Aqualight
23.10.2020 kl 22:52 8263

Sidste del af den manglende opdatering er nu leveret.

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:13 Du må logge inn for å svare
Aqualight
27.10.2020 kl 16:47 8117

Produktionstal for perioden 19/10 - 26/10 fra SLK Feltet, ser ud som følger:

Produktion i alt 4327
Produktion til Zenith 1947,15
Produktion til Zenith pr. dag 278,16

Bruttoindtægt før udgifter ved 40$
40$ X 1947,15 = 77.886$ (721.344,89 nok kr.)

Så endnu en fornuftig uge med lidt over det normale i produktion (normal ud fra snittet på 245 om dagen)

Jeg har endnu ikke fået produktions omkostningerne oplyst af AC, men han har jo nok også meget andet at se til.

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:13 Du må logge inn for å svare
Herbius
27.10.2020 kl 20:07 8001

Så fint AQ, så må vi håbe de snart får aftalen lukket med myndighederne 👍👍

Mon ikke der kommer noget godt denne uge 🙏🙏🙏
Redigert 21.01.2021 kl 02:13 Du må logge inn for å svare
Aqualight
28.10.2020 kl 00:39 7896

Må jeg i alt stilhed godt minde om, at alle lige læser RNS fra 30 Sep - 2020, igen & igen, et lille udsnit er følgende :
In agreement with our independent auditors, we have delayed the publication of our audited financial results for the year ended March 31, 2020 whilst we await a final decision from the Ministry of Hydrocarbons of the Republic of the Congo in response to our comprehensive technical and commercial offer for a new 25-year license for the Tilapia oilfield.

I look forward to reporting on our exciting progress in due course."

Jeg tror umiddelbart ikke der bliver meldt en Tilapia aftale ud, men jeg tror der tilgår yderligere 2 felter i den næste RNS, 1 i produktion og 1 som skal i produktion, ikke dermed sagt at Tilapia aldrig bliver til noget, men vi kender jo mødedatoerne hvor den slags beslutninger bliver taget 4 gange årligt, jeg forventer ligeledes at Tunesien SLK bliver meldt ud, det vil give god mening så i alt vil jeg ikke blive overrasket over at vi efter næste RNS har 3 felter i produktion og 1 som skal i produktion, dette vil også styrke aktiekursen samt styrke økonomien, inden en afgørelse om Tilapia.

Vi får se, hvad der sker

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:13 Du må logge inn for å svare
Gullhaugen
28.10.2020 kl 07:30 7798

Så om jeg forstår deg riktig så gir dette Zenith en omsetning på 35 mill i året brutto? AC sier at produksjonskost der nede er 5 dollar pr fat. En ganske lukrativ butikk.
Redigert 21.01.2021 kl 02:13 Du må logge inn for å svare
Aqualight
29.10.2020 kl 08:32 7904

Bemærk at der i forbindelse med det udsendte, er nævnt at man forventer godkendelse af SLK handlerne indenfor 60 dage, hvilket stemmer overens med de datoer der tidligere er lavet et indlæg omkring.

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
03.11.2020 kl 10:22 7765

Produktionstal for perioden 26/10 - 01/11 fra SLK Feltet, ser ud som følger:

Produktion i alt 3792
Produktion til Zenith 1706,4
Produktion til Zenith pr. dag 243,77

Bruttoindtægt før udgifter ved 40$
40$ X 1706,4= 68.256$ (646.653,03 nok kr.)

Så endnu en fornuftig uge med lidt under den normale i produktion (normal ud fra snittet på 245 om dagen)

Hvis møderækken som tidligere udmeldt holder stik, så er det afholdt omkring den 31/10-2020, ser ikke der er meldt andet ud, så det må forventes. Hvilket også betyder at vi nu er i en meget afgørende fase i papirgangen, med hensyn til at få overdraget de 45% officielt. Det kan ikke udelukkes at dette vil påvirke aktiekursen positivt med sådan et cash flow.

Ps. Aftalerne ER betalt i henhold til de aftaler der blev indgået.

God dag derude

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
11.11.2020 kl 09:01 7168

Produktionstal for perioden 02/11 - 08/11 fra SLK Feltet, ser ud som følger:

Produktion i alt 3795
Produktion til Zenith 1707,75
Produktion til Zenith pr. dag 243,96
Produktion i snit over de 7 dage lander på 542,14

Bruttoindtægt før udgifter ved 40$
40$ X 1707,75= 68.310$ (613.592,16 nok kr.)

Så endnu en meget fornuftig uge med lidt under den normale i produktion (normal ud fra snittet på 245 om dagen set over en måned )

Feltet er meget stabilt, set i lyset af at det har leveret i efterhånden mange år.

Jeg er ikke i tvivl om at overdragelserne af rettighederne ER godkendt, og vi nu kun venter på papir gangen.

Ønsker jer en god dag

Aqualight 🇩🇰🇳🇴

Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Herbius
11.11.2020 kl 19:26 7048

Takker AQ 👍👍👍

Tingene spidser til, mon ikke der kommer noget inden den 24 november 😃😃

Man kan hurtig lave 100-300 % 👍

Glæder mig til den dag..
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
17.11.2020 kl 09:50 6602

Produktionstal for perioden 09/11 - 15/11 fra SLK Feltet, ser ud som følger:

Produktion i alt 3790
Produktion til Zenith 1705,5 (45%)
Produktion til Zenith pr. dag 243,64
Produktion i alt i gennemsnit over de 7 dage lander på 541,42

Bruttoindtægt før udgifter ved 40$
40$ X 1705,5= 68.220$ (618.219,95 nok kr.)

Så igen en meget fornuftig uge med lidt under den normale i produktion (normal ud fra snittet på 245 om dagen set over en måned )

Feltet er fortsat meget stabilt, set i lyset af at det har leveret i mange år.

Tingende er ved at spidse til nu, ventetiden ER lang, men mon ikke de tålmodige bliver belønnet.

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
gravemaskinen
17.11.2020 kl 09:59 6582

Vi får se på fredag hva den godeste italiener har for info å komme med...men dette drøyer enormt nå...eneste som holder denne oppe er at det fortsatt ikke er tatt noen avgjørelser i verken, Congo, Tunisia eller Nigeria til disfavør for Zenit...Kommer en av disse blir det pent...kommer de ikke er det kvelden...
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
17.11.2020 kl 10:56 6512

Tunesien (CCH) har afholdt møde i henhold til deres egen kalender, derfor må det også forventes at denne del er afgjort, og at indstillingen kun afventer godkendelse -

Nigeria har meddelt at de er klar til at komme med resultatet af budrunden (inden længe)

Det efterlader Congo, som er i forhandling, jeg tænker der er mange detaljer der skal være på plads, i en artikel jeg fandt stod der at der skulle være 7 interesserer i Tilapia, men om det er sandt eller ej? Det ved kun meget få. Der er rigtig mange betalte artikler som selvfølgelig er farvet meget af dem der har betalt.

Hvis vi får yderligere oplysninger om noget i denne uge kan jeg kun se for mig at det omhandler SLK - Tunesien.

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
23.11.2020 kl 17:50 6329

Produktionstal for perioden 16/11 - 22/11 fra SLK Feltet, ser ud som følger:

Produktion i alt 3781
Produktion til Zenith 1701,45(45%)
Produktion til Zenith pr. dag 243,06
Produktion i alt i gennemsnit over de 7 dage lander på 540,00

Bruttoindtægt før udgifter ved 40$
40$ X 1701,45= 68.058$ (611.458 nok kr.) og ved 45$ X 1701,45 = 76.566$ (687.797 nok kr)

Så igen en meget fornuftig uge med lidt under den normale i produktion (normal ud fra snittet på 245 om dagen set over en måned )

Som en lille bonus får i gasproduktionen fra SLK med for samme periode :

I alt 16,7 mcf
45% til Zenith = 7,515 mcf.

En melding om SLK overtagelsen har vist aldrig passet bedre ind end i disse tider.

Vi ser hvad der sker i morgen.

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
26.11.2020 kl 13:50 6293

Et par opdateringer (for egen regning skal lige tilføjes) indsatte link er uden dato, men det ser meget nyt ud, så jeg antager der har været den omtalte aktivitet (work over) på SLK for ganske nylig altså i indeværende år 2020
http://smip.com.tn/references/slk-7-work-over.html

Derudover har jeg kørt lidt data på frekvensen af udmeldinger i forhold til udmeldinger som er kommet fra ministeriets rådgivere, og billede er meget entydigt, på trods af at rådgiverne mødes 4 gange årligt og udmeldinger derfor statistisk burde fordele sig jævnt over hele året, så viser mine indsamlede tal fra 2007 - 2019 at december måned, specielt mellem den 1/12- 13/12 en tydelig overvægt af udmeldinger, både positive og negative til ETAP.

Ovenstående er udelukkende til information og er ikke en købs eller salgs anbefaling.

Ønsker jer en god dag

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Bullshark
26.11.2020 kl 14:03 6342

Bra jobbet @Aqualight, slike meldinger er konstruktivt og nyttig. Til motsetning fra annet søppel som blir kommunisert på Hegnar forum.
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Herman*
26.11.2020 kl 14:23 6301

Bra. Håper vi er i mål før jul.
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
gravemaskinen
26.11.2020 kl 14:53 6273

Veldig bra aqua... Har du funnet noen meldinger i denne perioden hvor denne type lisens kjøp ikke har blitt godkjent, eller snakker vi stort sett proforma saksgang??
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
26.11.2020 kl 17:11 6228

Størstedelen af de godkendelser der bliver sendt videre til ETAP er jo lidt specielle, da de allerede var handlet af firmaerne i mellem, meget som “vores” nuværende situation, men i 2011, 2012 samt 2015/2016, har der været udsættelse af møder i CCH, på grund af diverse krige, konflikter og andet. CNPC overtager i 2004 - 50% af SLK feltet, fordelingen som vi kender den i dag med 22,5% til CNPC og 22,5% til KUFPEC, resulterede også i at de sidste 5% gik tilbage til ETAP, denne del har jeg ikke kunne finde dokumentation for skulle være sket i en forhandling, så den kan kun komme fra ministeriets rådgivere CCH! Jeg ser ikke at der skulle være tegn på proforma godkendelser, men det vil der uden tvivl være (nok mest udbredt overfor de meget store ENI - CNPC -KUFPEC- EXXON osv.) jeg mener at have fundet 3 tilfælde hvor der har været afslag i perioden, men jeg har ikke fundet baggrunden for afslaget. Men fortællingen omkring SLK er meget spændene, jeg har før delt tidslinjen fra 1989 frem til 2012, men gør det igen, da det giver en god indsigt i hvor meget feltet har betydet for landet og for måske at give et indblik i, at det nærmest er noget helligt for magthaverne der skal overdrages, god læselyst:
DualEx Energy (DXE.v) and Africa Hydrocarbons (NFK.v) have set their sights on completion and testing operations at their Bouhajla North prospect (BHN-1) in the Bouhajla Permit in onshore Central Tunisia. Bouhajla North is a geological analogue of the Sidi el Kilani oil field located 25km to the East. A comprehensive review of the Bouhajla North prospect was carried out here.

The Sidi el Kilani oil field is located in the former North Kairouan Block in central onshore Tunisia. It was discovered in 1989 by the Kuwait Foreign Petroleum Exploration Company (KUFPEC), with ETAP, the Tunisian state company, as a partner. What follows is a comprehensive year by year review of the oil field since discovery. As Bouhajla North is a geological analogue of the field, (confirmed by 2D and 3D seismic data plus the recent drilling of the prospect) the information gathered will enable investors to forecast how developments at Bouhajla North would pan out should BHN-1 proceed into production:

1989
In 1989, oil was discovered in apparently commercial quantities after drilling the SLK-1 well on the North Kairouan Block and encountering 80 metres of pay. An extended flow test proved that a high flow rate could be sustained. Detailed seismic surveying was performed to delineate the productive structure and to give further information on nearby prospects. Extension for the permit was obtained and a programme of appraisal/development drilling and further exploration planned.

1990
The first appraisal well of the discovery, SLK-2, begun drilling in 1990. Drilling was however cut short before SLK-2 reached its full target depth on 4th August 1990 after the closure of KUFPEC’s Head Office in Kuwait as a result of the Iraqi invasion of Kuwait. Though the well had already penetrated the target Abiod chalk, it had failed to encounter the productive strata that had been encountered by the earlier Sidi el Kilani discovery. However, the well was temporarily plugged under force majeure, for possible later re-entry.

1991
KUFPEC resumed work in Tunisia in September 1991.

After operations commenced, an extended production testing of SLK-1 was initiated. The well commenced production in September at 2,000 bopd and was increased to 2,800 bopd in October. Total oil produced from Sidi el Kilani during 1991 was 280,000 barrels. The production performance for the 4 months so far was considered satisfactory.

Oil produced was transported by road tankers to Compagnie Franco Tunisienne des Petroles’ (CFTP) pipeline terminal at Sidi el Itayem. The oil was subsequently transported by pipeline to the La Skhirra tank farm and the sea export terminal. The Sidi el Kilani crude was sold to Western Europe as Zarzaitine Blend.

The 2nd appraisal well SLK-3 was spudded in November 1991 and was successful in penetrating approximately 130 metres of prospective Abiod formation and proving oil 85 metres below what was considered to be the lowest oil at SLK-1.

1992
Testing performed on SLK-3 in early January 1992 produced clean 40° API oil at a rate of upto 7,000 bopd. As a result, it was felt that SLK-2 required deepening to penetrate the Abiod formation fully.

Following the successful 6 month long production test which ended in March 1992, a mining license application was submitted for full development.

The production for 1992 was 250,000 standard barrels; equivalent to an average daily rate of 694 stb/d. While awaiting installation of permanent production facilities and a pipeline, field production continued utilizing the temporary facilities and trucking.

SLK-2 was re-entered and drilled through the Abiod reservoir but failed to produce hydrocarbons during testing. Two further appraisal/development wells were drilled during the year.

The SLK-4 well was completed as a production well and produced oil at 8,600 stb/d on a 1½" choke.

The SLK-5 well was drilled to appraise the north of the field and encountered a non-reservoir in the Abiod formation and no testing operations were conducted.

During 1992, Enterprise Tunisienne D’Activities Petroleum, (ETAP) the Tunisian state oil company, exercised its contractual option to participate in the development of the Sidi el Kilani oil field.

1993
The Sidi el Kilani oil field was brought on commercial production during 1993 utilising temporary production facilities. Field production to end December was in excess of 2mmstb. The average daily production rate for the year was 5,622 stb/d.

Significant progress on the development of the SLK oil field was made during the year. Development wells SLK-3 and SLK-4 were hooked up and flow lines installed from the wells to the Gas Oil Separation Plant (GOSP). Upgrades to the GOSP were initiated. This was expected to facilitate an increase in daily offtakes to around 15,000 stb/d.

A 3D Seismic survey was acquired over the Sidi el Kilani structure during the year.

1994
The GOSP was installed and commissioned. Following the interpretation of the 3D Seismic data, an additional development well was drilled in the southern part of the field. This well, SLK-6, was connected to the production facilities at a stable rate of 7,000 stb/d. Following the success of SLK-6, the field capacity was increased to 18, 000 stb/d. However, oil continued to be trucked to the CFTP pipeline at Sidi el Itayem and production was limited to 14,500 stb/d due to constraints in crude throughout and handling capacity.

Further development drilling to confirm the need for a dedicated pipeline was planned.

1995
Development well SLK-7 was successfully drilled and completed as an oil producer in September 1995. Sidi el Kilani closed production at year end with production rates in excess of 18,500 stb/d. The average daily production for the year was however 15,902 stb/d.

The oil continued to be trucked to the export pipeline at Sidi el Itayem. In addition, direct trucking to the export terminal at La Skhirra commenced on 2nd June 1995 following the signing of a MOU between KUFPEC and Transports par Pipe-Lines au Sahara (TRAPSA).

A decision on whether to build a dedicated pipeline to the export terminal at La Skhirra or a tie in to the existing pipeline at Sidi el Itayem was to be made after reservoir engineering studies and economic evaluations were completed.

Peak daily production from the Sidi el Kilani field was achieved in 1995 when production was just shy of 20,000 stb/d on one of the days.

1996
Average oil production was 18,076 bpd, an increase of 13% from the previous year. Sidi el Kilani was now producing almost a third of Tunisia’s entire oil production. Production continued to be transported by tanker to the CFTP pipeline at Sidi el Itayem and from there by pipeline to the TRAPSA export terminal at La Skhirra on the Mediterranean Sea.

Major facilities enhancements were successfully completed with the installation of an oil cooler to enhance oil recovery, a de-gassing boot, and a low pressure flare system. Safety modifications continued with improvements to the fire and gas detection system and installation of a storage tank deluge system and fire extinguishing system. New fire pumps were installed and the firewater storage pond was upgraded to comply with international standards.

1997
Average production at Sidi el Kilani for the year was down 17% to 15,017 bpd. This was a result of the natural decline of the field. Sidi el Kilani was the third largest producing field in Tunisia after El Borma and Ashart. Plans were put in place to maximise oil recovery with sidetrack drilling and recompletion workover of two wells.

During the year, a contract was awarded to construct a pipeline direct from Sidi el Kilani to La Skhirra at a cost of $12 million. Land acquisition and engineering design commenced, with the pipeline expected to be operational in 1999.

Del 1

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
26.11.2020 kl 17:13 6226

Fortsættelse del 2

1998
The average production for 1998 was 14,702 bpd. Construction of an 8 inch, 123km pipeline from Sidi el Kilani to La Skhirra commenced. The pipeline was scheduled to be completed in the first quarter of 1999. By eliminating the need for transporting oil by truck, the pipeline was expected to save approximately 6% per barrel in wellhead to market costs and provide potential for further tariff review.

1999
The 123km, 8 inch overland pipeline with a capacity of 25,000 bopd from Sidi el Kilani to the La Skhirra export terminal was commissioned.

Production averaged 13,740 bpd, 1,600 bpd higher than forecast, but about 1,000 bpd less than the previous year. The property now provided about 1 in 6 of Tunisia’s total production.

Additional developments were undertaken on the producing Sidi el Kilani property to maximise ultimate recovery from what was now a mature field. This programme included a re-entry and a horizontal sidetrack, the drilling of a water disposal well, installation of additional power generation capacity and improved water treatment and handling facilities.

2000
Advanced isotope tagging technology was utilized in the Sidi el Kilani reservoir to identify the origins of fluids, recognize compartmentalization and establish various correlations in the reservoir.

Due to the continuing natural decline of the field, production (liquids bpd) averaged 12,241.

2001
Average production for 2001 was 7,452 bopd. A detailed review of the reservoir model was undertaken in order to define additional well locations. Three locations were identified for drilling in 2002 – a sidetrack of an existing dry hole, a contingent development location and an independent closure in the south of the field. The Sidi el Kilani field had by 2001 produced in excess of 42 Million barrels of oil, considerably in excess of earlier expectations.

2002
Sidi el Kilani production continued to be exported to Western Europe as high quality Zarzaitine Blend. The field produced an average of 3,240 bpd. After a full decade of productive life, the field had far exceeded the most optimistic expectations with total production of 43 Million barrels.

A successful sidetrack was drilled to stem the decline but two other planned wells were deferred. The oil field was now being managed using sophisticated reservoir modeling with a view to recovering the remaining reserves in the most efficient manner possible.

2003
By the end of the year, the Sidi el Kilani field had produced over 44 Million barrels of oil. Average production exceeded 2,500 bopd. An additional infill production well drilled in 2002 completed a full year production and on 15th November a new step-out development well was spudded.

2004
Average production for 2004 was 2,400 bopd. An additional development well was completed and put on long term test pending installation of glow lines to the main plant.

The Chinese National Petroleum Company (CNPCI) farmed in 50% of KUFPEC’s equity in the North Kairouan exploration block and the Sidi el Kilani oil field.

2005
Production for the year averaged 1,800 bopd. One water disposal well at Sidi el Kilani was planned for 2006.

2006
Production exceeded 1,500 bopd in 2006. Drilling of 2 additional development wells was planned for 2006/2007.

2007
Stable annual production of the Sidi el Kilani oil field was maintained by taking a series of effective measures including intensifying production performance analysis and dynamic reservoir monitoring, producing with a rational recovery rate to control the water cut and moderating the production decline. By the end of the year, production at Sidi el Kilani had topped 46 Million barrels. Average production for the year exceeded 1,300 bopd.

Drilling of 2 additional wells within a development plan for 2006/2007 resulted in 1 dry hole which was converted to a water disposal well, and the suspension of a second well pending test results.

2008
By the end of 2008, the field had achieved a cumulative total gross oil production in excess of 47 Million barrels. Average production for the year was 1,250 bopd. An integrated field study was initiated in 2008 to identify any remaining development potential. One development well was planned for 2009 dependent upon the results of the study.

2009
Sidi el Kilani continued to outperform expectations due to a lower than estimated production decline rate. Oil production averaged 1,118 bopd.

The Integrated Field Study was completed to define any possible remaining development drilling locations. One development well was planned for 2010.

2010
Gross oil production was at 1,040 boepd. A Technical Study performed in 2010 defined new drilling potential, targeting both shallow (development) and deep (exploration) targets that would be tested in 2011.

2011
Average production rate for 2011 was 533 bopd. SLK-13 was drilled with efforts towards the drilling of deep potential targets.

2012
Gross oil production at the Sidi el Kilani oil field in 2012 was about 770 bopd with enhanced performance of the wells. Efforts were continued in 2012 toward optimizing the field development strategy. Sidi el Kilani closed the year with 9 producing wells.


And that is the year by year chronicle of the Sidi el Kilani oil field since it was discovered 24 years ago. It has no doubt been one of the most important oil fields in Tunisia’s history producing nearly 49 Million barrels to date.

Originally earmarked to have a 9 year production life cycle, it has kept flowing for over two decades. This can be attributed to the little understanding of fractured carbonate reservoirs when the discovery was made. Much has changed since then. There has been a vast improvement in the understanding of fractured reservoir models. 3D acquisition and inversion techniques now allow the building of a requisite model to perform dynamic reservoir stimulation. Indeed, it is these latest techniques that have considerably lengthened the production life of Sidi el Kilani.


Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
01.12.2020 kl 12:35 5923

Produktionstal for perioden 23/11 - 29/11 fra SLK Feltet, ser ud som følger:

Produktion i alt 3605
Produktion til Zenith 1622,25 (45%)
Produktion til Zenith pr. dag 231,75
Produktion i alt i gennemsnit over de 7 dage lander på 515

Bruttoindtægt før udgifter ved 40$ & 45$

40$ X 1622,25 = 64890$ (572.037 nok kr.) og ved 45$ X 1622,25 = 73001$ (643.540 nok kr)

Dagsproduktion i snit fordelt over de 7 dage lander på 515

Den lavere produktion skyldes almindelig vedligehold på site.

Ønsker alle en god december

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
08.12.2020 kl 12:08 5684

Produktionstal for perioden 30/11 - 06/12 fra SLK Feltet, ser ud som følger:

Produktion i alt 3511
Produktion til Zenith 1579,95 (45%)
Produktion til Zenith pr. dag 225,70
Produktion i alt i gennemsnit over de 7 dage lander på 501,57

Bruttoindtægt før udgifter ved 40$ & 48$

40$ X 1579,95 = 63198 $ (554.092,98 nok kr.) og ved 48$ X 1579,95= 75837,60 $ (664.906,31 nok kr)

Dagsproduktion i snit fordelt over de 7 dage lander på 501,57

Ønsker alle en god december

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 02:14 Du må logge inn for å svare
Aqualight
15.12.2020 kl 12:30 5384

I denne ventetid (for nogen er den jo hård 😊) får i de seneste tal 🎅🏻😷

Produktionstal for perioden 07/12- 13/12 fra SLK Feltet, ser ud som følger:

Produktion i alt 3502
Produktion til Zenith 1576 (45%)
Produktion til Zenith pr. dag 225,14
Produktion i alt i gennemsnit over de 7 dage lander på 500,28

Bruttoindtægt før udgifter ved 45$ & 50$

45$ X 1576 = 70920 $ (620.002,00 nok kr.) og ved 50$ X 1576 = 78800 $ (689.136,00 nok kr) eller henholdsvis 88.571,7 nok kr og 98.448,00 nok kr pr. Dag.

Dagsproduktion i snit fordelt over de 7 dage lander på 500,28

Nu mangler vi blot RNS, så er vi kørende.

Ønsker stadig alle en god december

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Aqualight
21.12.2020 kl 15:08 5006

Produktionstal for perioden 14/12- 20/12 fra SLK Feltet, ser ud som følger:

Produktion i alt 3527
Produktion til Zenith 1587,15 (45%)
Produktion til Zenith pr. dag 226,73
Produktion i alt i gennemsnit over de 7 dage lander på 503,86

Bruttoindtægt før udgifter ved 50$

50$ X 1587,15 = 79357,5$ (693.650,00 nok kr) 99.092,00 nok kr pr. dag

Vi mangler blot en bekræftende RNS, så er vi kørende.

Ønsker stadig alle en god december, næste uges opdatering er årets sidste 🎅🏻

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Herman*
21.12.2020 kl 20:18 4913

Lato: Du som er sjefshausseren blant oss: Kommer det gode nyheter før jul?
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Slettet bruker
21.12.2020 kl 21:07 4921

Jeg tror det! Men vet ikke om AC kan kontrollere dette selv. Men mulig vi venter på news fra Tunisia og han ønsker dette skal være første nyhet! I fjor kom det nyhet på julaften.

Kan ikke forstå at ZENA ikke har mottatt nyheter fra Nigeria.

CONGO er jeg usikker på. Jeg har iallfall god følelse på news! Men når vet jeg ikke.
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Herman*
21.12.2020 kl 21:50 4848

Alle som ble prekvalifisert har jo angivelig fått en andel i en lisens, men myndighetene går nok ikke ut med lista før etter fristen for innbetaling av signaturbonus. Zenia kan selvsagt meddele markedet hva de er tilbudt så fremt de ikke har skrevet under en nda frem til myndighetene og selskapene går ut med en felles koordinert melding. Burde være i alles interesse å få avklart dette før jul.
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Slettet bruker
21.12.2020 kl 21:54 4848

Enig med deg at de siste 14 dagene har det blitt stilt fra ledelsen. Mulig de har fått innsideinformasjon og venter på noe før de går ut med børsmelding.

Jeg tror vi er på vei mot noe bra! Men har kan sør skje!

Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Gullit
21.12.2020 kl 23:41 4782

Han svarer no som alltid meget kjapt. I dag svarte han etter få timer. Kan selvsagt ikke si noe om når melding kommer eller om avtaler er spikret, men avsluttet meget høflig slik:

I take the chance to wish you a very Happy Christmas and New Year

Kind regards,

Andrea Cattaneo

Chief Executive Officer

Zenith Energy Ltd.



Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Gullit
23.12.2020 kl 08:12 4517


23.12.2020 08:00:00: Successful bid for Tilapia II

Da er vi i gang. Dette kan bli stort.
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Aqualight
23.12.2020 kl 08:43 4540

Inden det går løs, husk nu HOLD FAST, det bliver voldsomt det her “Ride” hvis ikke i har prøvet sådan en tur før, så kommer i til at tænke hold da kæft, mange gange i løbet af dagen. Tillykke til de gamle og også de nye.

Glædelig jul

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Gullit
23.12.2020 kl 08:46 4605

Ingenting til salgs her no. Mange flere triggere og hvem vet, Zenith kan virkelig etablere seg. Er jo en meget lang kontrakt! Hold på aksjene!!
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Gullit
23.12.2020 kl 08:47 4629

Hvor er du i dag Lato? Vil dele denne stunden med deg også !!
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Svartsyn
23.12.2020 kl 08:57 4556

God jul Aqualight,og tusen takk for dine seriøse innlegg.
De fikk meg til å snitte ned ,enda skriften var blodrød.
Min bestefar sa, det kommer en dag for alt. Han fikk som regel rett til slutt.
Dette var fantastiske nyheter.....Går inn med siste sum idag,og så gleder eg meg til den videre ferden.
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Aqualight
23.12.2020 kl 14:29 4440

Velbekomme Svartsyn, så var der da en der læste med, som du ved har jeg selv snittet ned et par gange, og frugterne er i dag blevet modnet nok til en lang pension, hvis det var ønsket (det er det så ikke) nu skal aktierne ligge og modne yderligere 3-5 år, og med den pipeline af RNS der kommer bare i 2021, så tror jeg vi er ret godt kørende i december 2021 - 2022 - osv.

Nu kan julefreden godt sænke sig for en stund, men allerede mandag, når alle nu har læst sig grundigt op på Tilapia ll, så kommer der flere ryk.

Måske er der upassende men TAK, til alle jer som på den ene eller anden måde, måske formåede at skaffe mig og andre et stort antal aktier til en pris vi nok ikke kommer til at se igen, den slags tjenester ser man ikke så ofte. 👍

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Herbius
23.12.2020 kl 14:44 4631

Fuldstændig enig AQ 👍👍👍

Vi takker og bukker, vi har troet på projektet, og vi havde store NØDDER 👍👍😂😂😂

Det er vi blevet belønnet for 👍👍

Utrolig Vi ikke høre fra Oraklet Chris85 og Burn 💰💰💰💰💰💰
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Aqualight
23.12.2020 kl 15:11 4643

Her kommer lidt guf til de tekniske interesserede, som jeg nu mener man skal læse sig igennem vedrørende Tilapia ll, det kommer alt sammen fra AAOG:

The Tilapia field already has surface infrastructure installed with an underutilised, capacity of more than 4,000 bpd.

Link 1: https://investorcom.sitefinity.cloud/docs/librariesprovider10/archive/summary-notes/aaog-tlp-103c-13june19.pdf?sfvrsn=6383af29_2
Link 2 : https://www.aaog.com/docs/librariesprovider10/archive/summary-notes/aaog-tlp-103c-08august2019.pdf
Link 3: https://www.aaog.com/docs/librariesprovider10/archive/research/8-jun-18-aaog-djeno-unchained.pdf (dette link viser økonomien i detaljer, både udgifter og indtjening) Opex er opgivet til US$ 4,12/bbl

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Aqualight
24.12.2020 kl 12:38 4443

Glædelig jul 🎅🏻

Denne opgørelse giver et retvisende billede af produktions tallet til Zenith fra SLK, dog er min afregningspris ikke 51 $ men der i mod 44$ derfor er mit tal i regnearket ikke 2,1 mill $ men 1,87 mill $ (16.152.525,00 nok kr) før udgifter og den sidste betaling for de sidste 22,5%. Det efterlader stadig et pænt beløb til vores Zenith konto

Since April 20th Sidi El Kilani has produced 133,261 barrels of oil according to the Tunisian govt ETAP: Production journalière so Zenith’s 22.5% share of this (based in the KUFPEC deal) is 29,984 barrels of oil.

Since September 8th Sidi El Kilani has produced 55,339 barrels of oil according to the Tunisian govt ETAP: Production journalière so Zenith’s 22.5% share of this (based on the CNPC deal) is 12,451 barrels of oil.

In total, Zenith have 42,435 barrels of oil, which at today’s oil price of $51 would be worth $2,164,185. - kilde Marketgunslinger...

Lad os nu se om ikke der kommer en RNS inden vi skyder det nye år ind.

Aqualight 🇩🇰🇳🇴
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Gullit
24.12.2020 kl 12:49 4542

Takk for masse god info. God jul til deg⛄️⛄️
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare
Herbius
24.12.2020 kl 14:28 4580

Godt arbejde AQ 👍👍

Tror og håber jeg også, måske mandag 🙏🙏👍

Rigtig god jul herfra 🎅🎅🎅
Redigert 21.01.2021 kl 08:40 Du må logge inn for å svare