Myrseth er tilbake
https://www.hegnar.no/Nyheter/Boers-finans/2019/08/Myrseth-etter-krakk-jeg-saa-ikke-problemene-komme
Redigert 19.01.2021 kl 23:03
Du må logge inn for å svare
-
«
- 1
- 2 »
Slettet brukerskrev Hva skal Myrseth kødde til? Han er ikke lengre i styret men aksjonær.
Får bare ønske dere lykke til, det er garantert Myrseth som har solgt seg ut i løpet av dagen, noe som selvfølgelig blir godtatt av børsen.
Det var deg det ;-) Stusset på handelsmønseret når jeg handlet i dag..
1,7mill USD i minus for Q2. Greit å komme med dette nå slik at det ikke kommer som et sjokk når de legger frem Q2 tall.
Men se nå til å få booket flåten full for Q4.
Men se nå til å få booket flåten full for Q4.
Odi.1
06.08.2019 kl 17:24
1459
17:01 i dag https://newsweb.oslobors.no/message/482305
"
SeaBird Exploration: estimated Q2 2019 and financial update relating to ongoing surveys
6 August 2019, Limassol, Cyprus
Reference is made to the press release of 29 July 2019 regarding the ongoing
niche 3D survey in West Africa utilizing the "Nordic Explorer" and a 2D survey
in the Americas employing the "Harrier Explorer".
Based on the current estimates for survey completion, the company expects to
report an EBITDA for the 2nd quarter of 2019 of negative USD 1.7 million. This
includes a loss provision for Q3 2019 of USD 1.3 million relating to the West
Africa 3D survey due to the contract being treated as an onerous contract
according to IAS 37. The provision is based on an estimated survey completion by
mid-September 2019.
Both the "Harrier Explorer" and the "Nordic Explorer" are rigged with the
"Digistreamer" technology and both surveys are affected by difficulties with
availability and lead-time of select seismic streamer equipment parts relating
to this technology. This includes a significant increase in the repair period
for streamer sections compared to historic experience caused by the service
offering, repair facilities and inventory level for certain technology
components included in the "Digistreamer" all being significantly downscaled
post the 2014 downturn. The company placed orders for repair of streamer and for
new streamer related equipment shortly after the contract awards. However, the
combined effect of worse than expected condition of the "Nordic Explorer"
streamer pool equipment (included in the charter-in agreement for the vessel),
increased repair period and logistical lead times exceeded the equipment related
contingency included in the project plans for the 2D and 3D surveys.
SeaBird will after completion of the projects have a significant pool of
repaired and tested "Digistreamer" ready for use. In addition comes a larger
pool of Sercel Sentinel streamer. The current "Digistreamer" related problems
are therefore not expected to have any effects on future 2D and niche 3D
projects.
The ongoing 3D survey in West Africa is estimated to be completed by mid
September 2019, more than two months later than the original survey plan,
predominantly due to the survey being acquired with two streamers versus four
streamers as originally planned. The extended survey duration will result in
increased operating expenses and generate an estimated project margin of
negative USD 1.4 million.
The ongoing 2D survey in the Americas is estimated to be completed ultimo
September 2019 which is about two months later than the original plan. The
extended survey duration will result in increased operating expenses and
generate an estimated project margin of close to zero.
Further, with reference to the press release of 29 July 2019, the Osprey
Explorer is currently transiting to the NCS for a two-month source project with
estimated completion late September/early October. This represents a new
contract award and is also the first contract with the relevant OBN contracto
"
"
SeaBird Exploration: estimated Q2 2019 and financial update relating to ongoing surveys
6 August 2019, Limassol, Cyprus
Reference is made to the press release of 29 July 2019 regarding the ongoing
niche 3D survey in West Africa utilizing the "Nordic Explorer" and a 2D survey
in the Americas employing the "Harrier Explorer".
Based on the current estimates for survey completion, the company expects to
report an EBITDA for the 2nd quarter of 2019 of negative USD 1.7 million. This
includes a loss provision for Q3 2019 of USD 1.3 million relating to the West
Africa 3D survey due to the contract being treated as an onerous contract
according to IAS 37. The provision is based on an estimated survey completion by
mid-September 2019.
Both the "Harrier Explorer" and the "Nordic Explorer" are rigged with the
"Digistreamer" technology and both surveys are affected by difficulties with
availability and lead-time of select seismic streamer equipment parts relating
to this technology. This includes a significant increase in the repair period
for streamer sections compared to historic experience caused by the service
offering, repair facilities and inventory level for certain technology
components included in the "Digistreamer" all being significantly downscaled
post the 2014 downturn. The company placed orders for repair of streamer and for
new streamer related equipment shortly after the contract awards. However, the
combined effect of worse than expected condition of the "Nordic Explorer"
streamer pool equipment (included in the charter-in agreement for the vessel),
increased repair period and logistical lead times exceeded the equipment related
contingency included in the project plans for the 2D and 3D surveys.
SeaBird will after completion of the projects have a significant pool of
repaired and tested "Digistreamer" ready for use. In addition comes a larger
pool of Sercel Sentinel streamer. The current "Digistreamer" related problems
are therefore not expected to have any effects on future 2D and niche 3D
projects.
The ongoing 3D survey in West Africa is estimated to be completed by mid
September 2019, more than two months later than the original survey plan,
predominantly due to the survey being acquired with two streamers versus four
streamers as originally planned. The extended survey duration will result in
increased operating expenses and generate an estimated project margin of
negative USD 1.4 million.
The ongoing 2D survey in the Americas is estimated to be completed ultimo
September 2019 which is about two months later than the original plan. The
extended survey duration will result in increased operating expenses and
generate an estimated project margin of close to zero.
Further, with reference to the press release of 29 July 2019, the Osprey
Explorer is currently transiting to the NCS for a two-month source project with
estimated completion late September/early October. This represents a new
contract award and is also the first contract with the relevant OBN contracto
"
Hva skal Myrseth kødde til?
Han er ikke lengre i styret men aksjonær.
Han er ikke lengre i styret men aksjonær.
2HB
06.08.2019 kl 17:03
2568
Myrseth bare kødder det til. Stoler ikke på den mannen for fem flate øre..
Så får den arrogante ledelsen i sbx fortsette å leke gjemsel til hodene forhåpentligvis ruller ut døra på GF
Må iallefall gi heder til Aksjonæren Myrseth for å prøve å sende ut litt informasjon rundt situasjonen i sbx!
Hvem fikk rett?
Vi skal være glad hvis den holder seg i + ut dagen. Og uten denne artikkelen med Myrseth så hadde vi vært i minus.
Mye tøyse handler her nå!!! 10-2-18-200-8-19
Markede har overreagert, tror du den vill holde seg på under kr lenge?;-) Neppe!!!!!!
Hvorfor skulle den stige 10% idag?
Da må det komme en kontrakt.
Da må det komme en kontrakt.
volumet er avtagende. HVIS ikke noen begynner å kjøpe skikkelig så ser vi neppe 10% oppgang!!!
Vi får se hvem som som får rett kl 16.20 ;-)
Denne kommer ikke gå opp 10 % idag!
Litt forsinket ;-) Gått over 10% i pluss 16.20 ;-) Folk sitter å følger med, denne stikke snart. Trykk på kjøp nå folkens ;-)
Gjør dere klar til neste rykk ;-) Før 13.
00;-)
00;-)
Odi.1
06.08.2019 kl 12:01
3179
tror dem kommer litt etter litt nå utover sensommeren og begynnelsen på høsten...
selskapene har også sine " forpliktelser" , ovenfor myndigheter , slik jeg har forstått dette...
time will showe...
selskapene har også sine " forpliktelser" , ovenfor myndigheter , slik jeg har forstått dette...
time will showe...
Redigert 06.08.2019 kl 12:02
Du må logge inn for å svare
Dette ødelegger IKKE SBX sitt rykte. Men så har de jo allerede noe frynsete rykte. Tror bare ikke det blir verre pga dette.
Norbo
06.08.2019 kl 11:56
3213
Nettopp! He treffer du spikeren. Nesten kun SBX som har kapasitet og utstyr i et såkalt oppheta marked... men ingen kontrakter til SBX..? Årsaken sier seg selv!! De tar ikke risikoen helt enkelt, mye penger for olje selskapene.
Norbo
06.08.2019 kl 11:49
3252
Fikk problemer med utstyret..?? Hallo de inngikk kontrakt på utstyr de ikke hadde! Hadde det ikke vært SBX sin feil hadde de fått betalt.
Odi.1
06.08.2019 kl 11:37
3295
Snart kun SBX som har kapasitet igjen på 2D.
Så dem har fine tider fremover med denne konservative teknologien.
Blir som ett ORIONFLY, det tar grovsøkene. Noen må jo det også.
Så får NY teknologi finne eksakte , og produksjons bare feltene. ( Mseis- Emgs- Ags mf )
Så dem har fine tider fremover med denne konservative teknologien.
Blir som ett ORIONFLY, det tar grovsøkene. Noen må jo det også.
Så får NY teknologi finne eksakte , og produksjons bare feltene. ( Mseis- Emgs- Ags mf )
Ta en bolle!
Fordi de fikk litt problemer med utstyret? Neppe!
Norbo
06.08.2019 kl 11:28
3340
Men dere tror ikke at div oljeselskap vil være nølende til å nærme seg kontrakter med et selskap som SBX..???
Liker ikke at de bruker uttrykket "relativt stabil". Hva menes med relativt? Er det fortsatt noen "småproblemer" ute å går?
Odi.1
06.08.2019 kl 11:23
3363
Ledelsen sa jo de stilte med feil utstyr, dette er ikke min feil , jakal
Dette koster penger, jakal
Dette koster penger, jakal
Disse utsettelsene kan også ha forstyrret Sbx sitt arbeid med å inngå kontrakter for Q4.
Nå forventer jeg fortgang og 4 kontrakter før Q4 da de pr.idag har 4 skip ledige i den perioden.
Det er litt bekymringsverdig at SBX har så liten flåteutnyttelse i så nær fremtid når vi hører om andre seismikk selskaper som nesten har fullbooket 2020.
Resultatene vil som kjent bli dårligere i Q2 og Q3 men dette bør ikke ødelegge noe for fremtiden.
Nå forventer jeg fortgang og 4 kontrakter før Q4 da de pr.idag har 4 skip ledige i den perioden.
Det er litt bekymringsverdig at SBX har så liten flåteutnyttelse i så nær fremtid når vi hører om andre seismikk selskaper som nesten har fullbooket 2020.
Resultatene vil som kjent bli dårligere i Q2 og Q3 men dette bør ikke ødelegge noe for fremtiden.
Haha :)
Jakal
06.08.2019 kl 11:03
3464
Odi.1 kl 10.21: SBX helt ute av kontroll.
Merkelig å doble beholdningen dersom en ikke har tro på selskap og ledelse, mulig at du er bipolar men tillater meg å stusse likevel...
Merkelig å doble beholdningen dersom en ikke har tro på selskap og ledelse, mulig at du er bipolar men tillater meg å stusse likevel...
Norbo
06.08.2019 kl 10:58
3498
Hva er egentlig snittet og beholdningen til dere som har snittet ned siden 1,6...????
Odi.1
06.08.2019 kl 10:57
3511
Slettet brukerskrev Problene er forbigående mener Myrseth.
Selvsagt, alt teknisk er løsbart..
Vil forsinke, vil koste, men det vil ikke rokke på potensialet fremover.
Vil forsinke, vil koste, men det vil ikke rokke på potensialet fremover.
Selvfølgelig er problemene forbigående! Utstyret er jo allerede fikset! Markedet overreagerte noe helt hinside! Men kontrakts tørken er det store problemet
Odi.1
06.08.2019 kl 10:55
3524
Da ble SBX beholdningen Doblet :)
Med så marginal gjeld er dette nesten penger på Bulevarden…
-
«
- 1
- 2 »