PPA i boks for anlegget som Scatec & Co vant i Malaysia i Desember.

KUALA LUMPUR: Tenaga Nasional Bhd  has signed the LSS photovoltaic power purchase agreement with the successful bidders of the large-scale solar competitive bidding exercise organised by Suruhanjaya Tenaga to develop transmission-connected LSS projects.

In a stock exchange filing, TNB said on Friday it signed the agreement with Redsol Sdn Bhd, a special purpose company of the bidders, Fumase (Malaysia) Sdn Bhd and Scatec Solar Malaysia BV.

"Redsol will design, construct, own, operate and maintain a solar photovoltaic energy generating facility of 30MWac to be located in Mukim Beriah, Kerian, Perak," it said.

The agreement has an expected commercial operation date of Dec 31, 2019, and obliges the parties to sell and purchase the energy generated by the facility for 21 years. 


https://www.thestar.com.my/business/business-news/2018/03/30/tnb-signs-lss-photovoltaic-ppa-with-redsol/
DRUGGER123
03.04.2018 kl 21:21 4827

Brasil (ANEEL) har A-4 auksjon i morgen, onsdag 4. april. Får JV'et Scatec/Eqinor noen kontrakter?

National Electric Energy Agency (ANEEL) vil holde på onsdag (4/4) generasjons auksjonen Nº 01/2018 - "A-4". Målet med arrangementet er å ansette elektrisitet fra nye prosjekter for kraftproduksjon fra vannkraftkilder, vind, solfotospenn og termoelektrisk biomasse, med tilførsel begynner 1. januar, 2022.

Arrangementet vil bli holdt gjennom elektronikken , fra 10:00, på Electric Energy Trading Chamber (CCEE), i São Paulo. Det vil bli en pressekonferanse for å presentere resultatene kort tid etter arrangementet.

Den strøm som genereres vil være energi Kjøpsavtale objekt i den regulert miljø (CCEAR), de modaliteter for å sjekke med 20 års tilførsel for vindparker, solceller og termoelektrisk, og mengden av energi til vannkraftprosjekter med tilførsel sikt av 30 år.

http://www.aneel.gov.br/sala-de-imprensa-exibicao-2/-/asset_publisher/zXQREz8EVlZ6/content/aneel-realiza-leilao-de-geracao-a-4-na-proxima-quarta-feira-4-4-/656877?inheritRedirect=false&redirect=http%3A%2F%2Fwww.aneel.gov.br%2Fsala-de-imprensa-exibicao-2%3Fp_p_id%3D101_INSTANCE_zXQREz8EVlZ6%26p_p_lifecycle%3D0%26p_p_state%3Dnormal%26p_p_mode%3Dview%26p_p_col_id%3Dcolumn-2%26p_p_col_pos%3D1%26p_p_col_count%3D3
DRUGGER123
04.04.2018 kl 23:49 4667

Resultatene klare fra Brasil. Slik jeg leser de portugisisk språklig tabellene har Canadian Solar, Celeo Redes og STEELCONS fått de fleste prosjektene. Kroma har fått 2X20 MW. Som sikkert de fleste vet er Apodi-prosjektet Scatec bygger i Brasil nå sammen med Kroma. Muligens det blir et videre samarbeid med Kroma.
farmern
05.04.2018 kl 08:12 4566

Da ble det smuler der i såfall. Brazil planlegger ny auksjon allerede til vinteren leste jeg et sted, og så fant jeg dette på Twitter :)


Irene Rummelhoff fra @StatoilASA og Raymond Carlsen fra @ScatecSolar møtte hverandre tilfeldig på et fly til Dubai, satt i «honeymoon seat», og det ble starten på et samarbeid: bygger nå sol sammen i Brasil. Søt historie på #enova2018



EDIT: Hvorfor melder ikke SSO den avtalen som ble underskrevet i Malaysia på fredag tro?

March 30, 2018 19:50 pm +08

 

KUALA LUMPUR (March 30): Tenaga Nasional Bhd has signed a 21-year large-scale solar (LSS) photovoltaic power purchase agreement (PPA) with Redsol Sdn Bhd, under a bidding exercise organised by the Energy Commission in the first quarter of 2017.

Redsol is a special purpose company (SPC) of successful bidders Fumase (Malaysia) Sdn Bhd and Scatec Solar Malaysia BV.

In a filing today, TNB said Redsol will design, construct, own, operate and maintain a solar photovoltaic energy generating facility of 30MWac to be located in Kerian, Perak.

The PPA, which has an expected commercial operation date of Dec 31, 2019, will govern obligations of the parties involved to sell and purchase energy generated by the facility for a period of 21 years from then on.

The signing of the PPA will have a neutral impact on the earnings of TNB over the term of the agreement, said the utility giant.

Redigert 05.04.2018 kl 08:20 Du må logge inn for å svare
sindree
05.04.2018 kl 08:19 4544

Fin børsmelding i dag. Med generelt løft på børsene i dag blir det sprnnende å se hvor langt den kan gå.
DRUGGER123
07.04.2018 kl 01:23 4365

Bekreftet hvem som har fått tilslag på A-4 auksjonen i Brasil.

According to Reuters, the winning bidders for the solar projects were Chinese-Canadian solar manufacturer, Canadian Solar, which also operates a 400 MW solar module factory in Brazil, Spanish developer Elecnor, and two Brazilian companies, engineering services provider, SteelCons and power distributor, Kroma.

https://www.pv-magazine.com/2018/04/06/brazilian-pv-market-is-maturing-faster-than-expected-comment/
DRUGGER123
07.04.2018 kl 01:27 4362

@farmern
Malaysia ble meldt 13.12.17. Derfor ikke nødvendig å melde at PPA var underskrevet.

Stort skille mellom land med fungerende systemer som Brasil og Malaysia, sammenlignet med land der praksis ennå ikke er etablert som for eksempel Pakistan, Kenya og Nigeria.
farmern
08.04.2018 kl 14:05 4131

Engie med vinnende bud i Senegal.

Engie wins Senegal’s 60 MW PV tender with bids under €0.040/kWh

The French energy giant will now build a solar PV power plant in Tauba, central Senegal, which will sell power at €0.0380 per kWh, while a second plant selling electricity at €0.0398 per kWh will be constructed in Kahone.

The first of the excluded bids for the Kahone project, submitted by Masdar and Moroccan investment firm, Nareva Holding, had offered to sell power at €0.0388 per kWh, followed by an offer of €0.0439 per kWh submitted by UAE-base investors, Access Infra Africa and French renewable energy company, Total Eren SA.

The following bids were those of U.K.-based emerging market investor, Actis and South African renewable energy developer, Mulillo Group (€0.0450 per kWh), Norwegian developer, Scatec Solar (€0.0459 per kWh), and Spanish energy company, Acciona (€0.0579) per kWh.

As for the Touba project, the first excluded bid was also made by the Masdar-led consortium (€0.03989 per kWh), followed by the offers of Access-Total (€0.0439 per kWh), Scatec (€0.0462 per kWh), Actis-Mulillo (€0.0488 per kWh), and Alten-Al Noways-Aldwych (€0.0516 per kWh).

thomasb
09.04.2018 kl 12:12 3933

Interessant å se prisen i budene fra Senegal. Scatec legger seg lavere enn de fleste, men et stykke unna de ivrigste. Budet er rett over det nivå de fikk tilbake fra Pakistanske myndigheter 0,053$, etter å ha søkt om 0,059$. Snitt i Reipppp 4 på solar, der PPA nylig ble underskrevet var på hele 0,091$, så det blir anlegg med god lønnsomhet. Nigeria forsøker for tiden å prute ned sine PPAer fra 0,115$ til 0,075$. Vi får se hvor den diskusjonen ender.