Zenith Energy- Congo: Tilapia, Zenas nye pengemaskin?>5.000 bopd
Ănsker Ă„ lage en egen trĂ„d Ă„ belyse totalt produksjon til selskapet 1 Ă„r frem i tid (alt f.o.m Januar 2021) og innhente informasjon om vĂ„rt ny anskaffede felt, Talipia Congo.
Jeg kaster meg ut og prÞver Ä lage et realistisk bilde pÄ hvor vi er om 1 Är; Sà - Hvor mye kan selskapet, realistisk sett, produsere om 1 Är- Januar 2021?
(Net. til Zenith Energy)
Azerbaijan:
Produserende felt:300 bopd
C 37: 250 bopd (Arbeid pÄ brÞnn pÄgÄr)
C 30: 250 bopd (Venter klarsignal fra SOCAR. Rigg montert og klar til boring)
M 247: 200 bopd (2H2020)
Totalt: 1.000 bopd
Italia: 500 bopd
Congo (Net 44,8% ekskludert opsjon pÄ 20% som vi gi total net 56%)
TLP 101:112 bopd (1H2020)
TLP 102: 224 bopd (1H2020)
TLP 103C (Djengo): 896 bopd (Forutsetter de klarer 2.000 bopd brutto, potensiale er 5.000bopd pr brĂžnn) (Late 2H2020)
TLP 104 (Djengo): xx (>5.000 bopd)
Totalt: 1.232 bopd
Total daglig produksjon fra Januar 2021: 2.732 bopd.
Mer om Congo, fra AAOG presentasjon Januar 2019:
https://www.proactiveinvestors.com/upload/SponsorFile/File/2019_02/1549465564_4---Anglo-African.pdf
Hvor mye vil en produksjon pÄ +2.700 bopd generere av cash, noen som vil prÞve seg?
Jeg kaster meg ut og prÞver Ä lage et realistisk bilde pÄ hvor vi er om 1 Är; Sà - Hvor mye kan selskapet, realistisk sett, produsere om 1 Är- Januar 2021?
(Net. til Zenith Energy)
Azerbaijan:
Produserende felt:300 bopd
C 37: 250 bopd (Arbeid pÄ brÞnn pÄgÄr)
C 30: 250 bopd (Venter klarsignal fra SOCAR. Rigg montert og klar til boring)
M 247: 200 bopd (2H2020)
Totalt: 1.000 bopd
Italia: 500 bopd
Congo (Net 44,8% ekskludert opsjon pÄ 20% som vi gi total net 56%)
TLP 101:112 bopd (1H2020)
TLP 102: 224 bopd (1H2020)
TLP 103C (Djengo): 896 bopd (Forutsetter de klarer 2.000 bopd brutto, potensiale er 5.000bopd pr brĂžnn) (Late 2H2020)
TLP 104 (Djengo): xx (>5.000 bopd)
Totalt: 1.232 bopd
Total daglig produksjon fra Januar 2021: 2.732 bopd.
Mer om Congo, fra AAOG presentasjon Januar 2019:
https://www.proactiveinvestors.com/upload/SponsorFile/File/2019_02/1549465564_4---Anglo-African.pdf
Hvor mye vil en produksjon pÄ +2.700 bopd generere av cash, noen som vil prÞve seg?
Redigert 21.01.2021 kl 04:09
Du mÄ logge inn for Ä svare
Slettet brukerskrev lol...
Det kan du si..
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Hva skal man si? Egentlig er det vel bare stille tÄrer. Helt utrolig.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Pe9s
13.02.2020 kl 22:18
4682
Kanskje AC mÄ ha penger til flybillett hjem igjen ifra Afrika...
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Herbius
13.02.2020 kl 22:21
4706
Op med humĂžret, folk smider i til overkurs đđ.
Bedre ind at ende som AAOG.
Kan mĂŠrke dette er den sidste đđ
Bedre ind at ende som AAOG.
Kan mĂŠrke dette er den sidste đđ
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Svartsyn
13.02.2020 kl 22:42
4659
Ja,det virker jo litt rart med henvisning til NOK.
Emisjonskurs 0,18 Þre og sluttkurs pÄ Oslo bÞrs idag ,var vel 0.163 Þre.
HÄper vi/Zenith har rÄd til borekrona som skal stÄ nederst pÄ borestrengen.
Tror jeg putter aksjene ned i skuffen , og hÄper pÄ en reprise ala Lifecare.
Har heldigvis siste stunden klar Ă„ holde meg unna og kjĂžpe flere aksjer.
Det kommer ikke til Ă„ skje fĂžr det kommer en nyhet om mere olje opp av bakken. Var begrunnelsen.
Og den kommer jeg til Ă„ ha videre til det evnt. skjer.
Emisjonskurs 0,18 Þre og sluttkurs pÄ Oslo bÞrs idag ,var vel 0.163 Þre.
HÄper vi/Zenith har rÄd til borekrona som skal stÄ nederst pÄ borestrengen.
Tror jeg putter aksjene ned i skuffen , og hÄper pÄ en reprise ala Lifecare.
Har heldigvis siste stunden klar Ă„ holde meg unna og kjĂžpe flere aksjer.
Det kommer ikke til Ă„ skje fĂžr det kommer en nyhet om mere olje opp av bakken. Var begrunnelsen.
Og den kommer jeg til Ă„ ha videre til det evnt. skjer.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
melbev
13.02.2020 kl 22:42
4658
Pe9s skrev https://newsweb.oslobors.no/message/495447
Er dette en rettet emisjon?
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Pe9s
13.02.2020 kl 22:56
4627
plans to issue up to 20,000,000 new common shares (âPrivate Placementâ) to existing UK institutional shareholders, as well as a selection of high net-worth private investors to raise gross proceeds of up to ÂŁ300,000 (approximately CAD$516,000 or NOK 3,626,000).
Ser ut til at dette er for noen aksjonerer i UK. đ
Mulig insidere?
Ser ut til at dette er for noen aksjonerer i UK. đ
Mulig insidere?
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Herbius
13.02.2020 kl 23:01
4609
Nok Miton đ.
Men utrolig han fĂ„ overpris, han er en dygtig mand ham AC, det synes han nok ikke om teamet i AS. đ
Man han har jo ansat dem..
Men utrolig han fĂ„ overpris, han er en dygtig mand ham AC, det synes han nok ikke om teamet i AS. đ
Man han har jo ansat dem..
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
kaunis
14.02.2020 kl 13:56
4414
Litt her og litt der, 19Ăžre her og 15Ăžre der 19,4 osv osv. Hold tungen rett i munnen her. ingenting eksakt om bruken. Hvor blir det av borenytt? og olja? og pengan?
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
HP17
14.02.2020 kl 19:43
4287
For et useriĂžst selskap. Hvor mange emisjoner har Zena gjennomfĂžrt de siste 6 mnd?
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Lippstokk
14.02.2020 kl 22:04
4190
Positivt att emien ble hÞyere enn dagens kurs-tror dette er siste fase i oppbyggingen av zenith og vil nÄ generere hÞyere kurs etterhvert!
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Svartsyn
14.02.2020 kl 22:28
4161
Denne rapporten var helt ok.
Redusering av korttids gjeld, det er bare Ä fÄ litt olje opp av bakken. Det er faktisk ikke sÄ langt unna , hvis de /vi bare fÄr startet opp.
At all tillit til Cattaneo er borte totalt fra aksjeinvestorer/markedet er litt verre.
Det er kun en vei ut av status, og det er mere olje opp av bakken.
VĂŠr dog litt klar over at "noen" er veldig tjent med at denne aksjekursen blir "holdt" nede.
Og de gjer seg ikke fĂžrste uka,for Ă„ si det forsiktig.
Til det er "belĂžnningen"for stor.
Men en ting kan snu bildet, olje i produksjon .
High risk/high reward er det samme.
Ha en flott kveld alle som en,unntatt en.
Redusering av korttids gjeld, det er bare Ä fÄ litt olje opp av bakken. Det er faktisk ikke sÄ langt unna , hvis de /vi bare fÄr startet opp.
At all tillit til Cattaneo er borte totalt fra aksjeinvestorer/markedet er litt verre.
Det er kun en vei ut av status, og det er mere olje opp av bakken.
VĂŠr dog litt klar over at "noen" er veldig tjent med at denne aksjekursen blir "holdt" nede.
Og de gjer seg ikke fĂžrste uka,for Ă„ si det forsiktig.
Til det er "belĂžnningen"for stor.
Men en ting kan snu bildet, olje i produksjon .
High risk/high reward er det samme.
Ha en flott kveld alle som en,unntatt en.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
TurboFisker
15.02.2020 kl 10:58
4031
Rapporten var grei, viser i hverfall stabilitet pÄ produksjonen. At C37 kan fÄ den berÞmte bridge pluggen og starte produksjon kan lÞfte selskapet betraktelig. AC har vÊrt litt "apekatt" og kjÞrte emisjon pÄ emisjon, men han har ogsÄ investert (Talipia Congo).
Ser et grei oppside med selskapet visst det blir Þkt produksjon i AZ og oppstart i Kongo, kan gÄ relativt hÞyt opp da.
Ser et grei oppside med selskapet visst det blir Þkt produksjon i AZ og oppstart i Kongo, kan gÄ relativt hÞyt opp da.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
bakeren74
16.02.2020 kl 00:12
3829
Det kunne jo vÊrt verre en dette, og etter hvert sÄ fÄr vi hÄpe at AC innfrir. Han har spredt risikoen bra pÄ alt nÄ, og noe bÞr innfri i lÞpet av 1h 2020.
Jeg er en tÄlmodig sjel, og var med PEN pÄ rundt 3 kr, men dette prosjektet er skummelt. Har gÄtt inn med ca 15-20 %, og risk/reward er i tilfelle eventyrlig godt hvis alt slÄr inn. Ser ikke bort i fra 2 kr per aksje her.
Jeg er en tÄlmodig sjel, og var med PEN pÄ rundt 3 kr, men dette prosjektet er skummelt. Har gÄtt inn med ca 15-20 %, og risk/reward er i tilfelle eventyrlig godt hvis alt slÄr inn. Ser ikke bort i fra 2 kr per aksje her.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
FAR100
16.02.2020 kl 09:26
3740
lett Ä forstÄ fra resultatet at salg har gÄtt mye ned, grunnet nedgang i Italia, ingen produksjon fra AZ eller andre felt. SpÞr du meg er det krise for AC. Zen klarer ikke Ä generere inntekter / oljefelt som gi dem inntekter. Det hjelper ikke med langsiktige prosjekter og kontinuerlig emisjoner for Ä hente penger. Zen er i big shit og katastrofe.
ser du pÄ siste medlinger fra zen er det bare tulle medlinger. Jeg vet at det kommer flerer emisjoner. neste pÄ 15 Þre i lÞpet av 1-2 uker
ser du pÄ siste medlinger fra zen er det bare tulle medlinger. Jeg vet at det kommer flerer emisjoner. neste pÄ 15 Þre i lÞpet av 1-2 uker
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Pe9s
16.02.2020 kl 09:31
3737
Du skal vĂŠre forsiktig med Ă„ si at du âvetâ...
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
bakeren74
16.02.2020 kl 09:57
3727
Jeg «vet» er ganske bombastisk, men skal si meg litt enig. Det har vÊrt mange emisjoner, sÄ jeg hÄper du har feil her.
NÄr det ser som mÞrkest ut, sÄ er det viktig Ä handle mer ihvertfall.
NÄr det ser som mÞrkest ut, sÄ er det viktig Ä handle mer ihvertfall.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
morgendagen
16.02.2020 kl 10:39
3700
MÄ huske, her er det mane som sitter pÄ utrolig mange aksjer, tenk nÄr alle disse skal selges.
Da trenger man utrolig mange folk Ă„ utrolig mye penger...
ZEN mÄ jo bli type equinor pÄ 6 mnd om man forventer utskifting/omsetting.
Da trenger man utrolig mange folk Ă„ utrolig mye penger...
ZEN mÄ jo bli type equinor pÄ 6 mnd om man forventer utskifting/omsetting.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Kantarell
16.02.2020 kl 11:32
3711
Lastet opp noen akser pÄ fredag - Men, ja det kan ta tid..
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Herbius
16.02.2020 kl 15:53
3610
Kan du dokumentere nedgang i Italia ??
Berig os med din enorme viden đđđ
Jafarli Field C-37Today 14:10
Contrary to what some BB posts here have implied, the forthcoming bridge-plug operation
at C-37 will have required thorough geotechnical planning and design, and may provide significant challenges to successful completion. Although the Zena A-100 rig is to be used it is possible that specialists will be employed for the plug emplacement.
From the limited information available it appears that the plug will be located immediately below the M Eocene productive section in an 'open-hole' ie uncased setting and since the stated purpose is to isolate the downhole Cretaceous sequence it presumably requires a permanent 'cement' plug. That implies that the plug is most likely to be emplaced using a 'dump bailer' run into the well on wireline. Interestingly the A-100 'front-on' 13th Feb twitter photo shows a guy inspecting what appears to be a bailer ie the pipe fitted with spacers for guidance within well-casing. The âcustom-builtâ spec will include some integral mechanics and electronics eg logging-tools, and probable flexibility for ease of run-in.
As the plug is to be in 'open-hole' it is not possible to install a mechanical packer as a base for the 'cement', the most likely substitute being a bentonite or polymer-based thixotropic support plug emplaced during initial run-ins of the bailer. Only when that is confirmed in place and sufficiently gelled will the 'cement' plug be emplaced, that too requiring several downhole runs. In an open-hole setting 'squeeze-cementing' techniques, used to enhance an impermeable interface with the wellbore walls, are inapplicable so the 'cement' plug will most likely be extended up-hole for several metres to compensate for this.
The 'cement' composition will presumably have been designed using simulation testing based on all known downhole physical and chemical parameters. It may well include emplacement of several 'cements' each of different composition, in sequence. This would be necessary for example, if the plug location is within the M Eocene basal limestones or is to provide the dual function of shutting off a high water-inflow zone.
Even from this highly simplified account it should be evident that this is not a ârun of the millâ infallible procedure. However, failure of plug emplacement is invariably followed by further attempts until success is achieved.. As the 11.02.2020 RNS refers to rig âmobilisation within the next 30 daysâ and the 13th Feb photo tweet indicates rig and 'dump bailer' testing in progress, C-37 operations should be underway soon. After completion the well will be placed on test to achieve optimum production, anticipated to be in the 250-300bopd range (ref 12.12.2019 RNS), with stimulation an option for future enhancement.
AGEOS.
Berig os med din enorme viden đđđ
Jafarli Field C-37Today 14:10
Contrary to what some BB posts here have implied, the forthcoming bridge-plug operation
at C-37 will have required thorough geotechnical planning and design, and may provide significant challenges to successful completion. Although the Zena A-100 rig is to be used it is possible that specialists will be employed for the plug emplacement.
From the limited information available it appears that the plug will be located immediately below the M Eocene productive section in an 'open-hole' ie uncased setting and since the stated purpose is to isolate the downhole Cretaceous sequence it presumably requires a permanent 'cement' plug. That implies that the plug is most likely to be emplaced using a 'dump bailer' run into the well on wireline. Interestingly the A-100 'front-on' 13th Feb twitter photo shows a guy inspecting what appears to be a bailer ie the pipe fitted with spacers for guidance within well-casing. The âcustom-builtâ spec will include some integral mechanics and electronics eg logging-tools, and probable flexibility for ease of run-in.
As the plug is to be in 'open-hole' it is not possible to install a mechanical packer as a base for the 'cement', the most likely substitute being a bentonite or polymer-based thixotropic support plug emplaced during initial run-ins of the bailer. Only when that is confirmed in place and sufficiently gelled will the 'cement' plug be emplaced, that too requiring several downhole runs. In an open-hole setting 'squeeze-cementing' techniques, used to enhance an impermeable interface with the wellbore walls, are inapplicable so the 'cement' plug will most likely be extended up-hole for several metres to compensate for this.
The 'cement' composition will presumably have been designed using simulation testing based on all known downhole physical and chemical parameters. It may well include emplacement of several 'cements' each of different composition, in sequence. This would be necessary for example, if the plug location is within the M Eocene basal limestones or is to provide the dual function of shutting off a high water-inflow zone.
Even from this highly simplified account it should be evident that this is not a ârun of the millâ infallible procedure. However, failure of plug emplacement is invariably followed by further attempts until success is achieved.. As the 11.02.2020 RNS refers to rig âmobilisation within the next 30 daysâ and the 13th Feb photo tweet indicates rig and 'dump bailer' testing in progress, C-37 operations should be underway soon. After completion the well will be placed on test to achieve optimum production, anticipated to be in the 250-300bopd range (ref 12.12.2019 RNS), with stimulation an option for future enhancement.
AGEOS.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
bakeren74
16.02.2020 kl 17:26
3543
Hva er realistisk tidsplan pÄ dette for de som har god kontroll pÄ noe sÄnt?
HÞrtes jo ikke lett ut nÄr jeg leste, og det virker da som at feiling er forventet synes jeg.
Men hvis den klemmer til med 250-300 fat olje igjen, sĂ„ er jo det helt supertđ
HÞrtes jo ikke lett ut nÄr jeg leste, og det virker da som at feiling er forventet synes jeg.
Men hvis den klemmer til med 250-300 fat olje igjen, sĂ„ er jo det helt supertđ
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Realistisk tidsplan og Zenith Energy er dessverre to uforenlige stĂžrrelser.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Herbius
16.02.2020 kl 18:24
3493
Ville have skrevet det samme nomaden đđđ.
Men tror han mener operationen đđ
Men tror han mener operationen đđ
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Herbius
16.02.2020 kl 18:50
3466
Thanks for the responses. The 11.02.2020 RNS confirmed that âIn recent months, the Company
has acquired additional drilling equipment to enhance its 1,200hp drilling rig, and enlarged its spare parts inventory in view of near-term drilling activities.â I take the first part of that to imply what I outlined on 14.01.2020, namely âthe recent hiatus in operational news regarding C-30 may...involve....upgrading the BD-260 rig in anticipation of both M-247, for which >1000m laterals may be intended, and for the Exploration Area well.â The enhanced BD-260 is, I guess, disassembled and at base awaiting SOCAR approval for C-30 drilling.
Information from the flow tests at C-37 might have a significant bearing on what they decide to do at C-30 since the two wells are only c500m apart, so for example if the data indicates absence of reservoir connectivity there might be an option to drill one or more laterals at C-30 as the rig will presumably now possess the capabilities for doing so. I will enlarge on those possibilities, if appropriate, nearer the time.
AGEOS
has acquired additional drilling equipment to enhance its 1,200hp drilling rig, and enlarged its spare parts inventory in view of near-term drilling activities.â I take the first part of that to imply what I outlined on 14.01.2020, namely âthe recent hiatus in operational news regarding C-30 may...involve....upgrading the BD-260 rig in anticipation of both M-247, for which >1000m laterals may be intended, and for the Exploration Area well.â The enhanced BD-260 is, I guess, disassembled and at base awaiting SOCAR approval for C-30 drilling.
Information from the flow tests at C-37 might have a significant bearing on what they decide to do at C-30 since the two wells are only c500m apart, so for example if the data indicates absence of reservoir connectivity there might be an option to drill one or more laterals at C-30 as the rig will presumably now possess the capabilities for doing so. I will enlarge on those possibilities, if appropriate, nearer the time.
AGEOS
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Jeg er redd alt som kommer til Ä skje er flere lovnader om resultater som aldri materialiserer seg, flere emisjoner som ikke gÄr til operasjonell drift, men rett i lomma til Cattaneo, som via familiemedlemmer e.l casher ut fÞr hele greia faller under vekta av sin egen korrupsjon. Jeg er negativ nÄ, men det siste Äret tatt i betraktning mener jeg at det stÞrre sannsynlighet for at investeringen blir spylt ned i dass enn at den gir avkastning.
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Herbius
16.02.2020 kl 22:09
3354
Nomaden.
PrÞv en gang og tÊnk hvis AC ikke havde handlet som han havde, sÄ havde vi haft 300 mio aktier, AS i problemer og firmaet havde vÊret tÊt pÄ konkurs da der ikke kunne kÞres PP fÄr at fÄ penge ind... Bonds havde heller ikke vÊret mulig..
Tror du bliver glad for AC valg i lĂŠngden, Som sagt, dette kunne have set meget vĂŠrre ud.
Se pÄ firmaets kommede portefÞlje nu, jeg er meget tilfreds med alt undtagen aktie kursen.
Men den kommer, nu bare vent đđđ
PrÞv en gang og tÊnk hvis AC ikke havde handlet som han havde, sÄ havde vi haft 300 mio aktier, AS i problemer og firmaet havde vÊret tÊt pÄ konkurs da der ikke kunne kÞres PP fÄr at fÄ penge ind... Bonds havde heller ikke vÊret mulig..
Tror du bliver glad for AC valg i lĂŠngden, Som sagt, dette kunne have set meget vĂŠrre ud.
Se pÄ firmaets kommede portefÞlje nu, jeg er meget tilfreds med alt undtagen aktie kursen.
Men den kommer, nu bare vent đđđ
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
erinho
16.02.2020 kl 22:13
3378
GĂ„r seg nok til pĂ„ sikt dette! Er mye mere optimistisk nĂ„ enn for 1 mĂ„ned siden. Zenith har flere ben Ă„ stĂ„ pĂ„, sĂ„ om det ikke gĂ„r i AZ sĂ„ kommer det til Ă„ gĂ„ andre steder. Har troa pĂ„ at det vĂŠrste er over og at vi har gode tider i vente. Dean Clark har hvertfall lastet opp 10 millioner aksjer de 2 siste ukene. Noe mĂ„ han vite đ€đ
https://ceo.ca/zee
https://ceo.ca/zee
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
Vekst
17.02.2020 kl 07:37
3263
Ny uke, ny muligheter- selv for Zenith :)
Forrige uke var begivenhetsrikt hvor fikk svar pÄ bla. alt gÄr som planlagt i AZ og ingen terminering/utkastelse. Bridgpluggen er pÄ vei til site og operasjonen skal gjenopptas innen kort tid.
Vi gÄr noen spennende/avgjÞrende uker i mÞte:
- C37- installasjon av Bridgplug innen medio Mars
- Igangsettelse av C30 er ventet kort tid
-Godkjent som partner i Congo
- Borestart av Talipia (Congo) April
- Endelig signering av nytt felt (West Africa)
......
Andrea reiste til Congo i helgen.
Han er innforstÄtt og har full fokus pÄ at selskapet skal levere pÄ det operasjonelle og Þke produksjonen frem mot sommeren og 2H 2020.
Det ny ervervede feltet vil gi produksjons engang 2H 2020.
Produksjonen kan bli "formidabel" allerede i Ă„r, men veien er fortsatt lang- men mye skal avklares den kommende tiden!
Forrige uke var begivenhetsrikt hvor fikk svar pÄ bla. alt gÄr som planlagt i AZ og ingen terminering/utkastelse. Bridgpluggen er pÄ vei til site og operasjonen skal gjenopptas innen kort tid.
Vi gÄr noen spennende/avgjÞrende uker i mÞte:
- C37- installasjon av Bridgplug innen medio Mars
- Igangsettelse av C30 er ventet kort tid
-Godkjent som partner i Congo
- Borestart av Talipia (Congo) April
- Endelig signering av nytt felt (West Africa)
......
Andrea reiste til Congo i helgen.
Han er innforstÄtt og har full fokus pÄ at selskapet skal levere pÄ det operasjonelle og Þke produksjonen frem mot sommeren og 2H 2020.
Det ny ervervede feltet vil gi produksjons engang 2H 2020.
Produksjonen kan bli "formidabel" allerede i Ă„r, men veien er fortsatt lang- men mye skal avklares den kommende tiden!
Redigert 21.01.2021 kl 03:12
Du mÄ logge inn for Ä svare
lutefish
17.02.2020 kl 10:27
4804
Fra AGEOS i gÄr :
Jafarli Field C-37
Sun 14:10
Contrary to what some BB posts here have implied, the forthcoming bridge-plug operation at C-37 will have required thorough geotechnical planning and design, and may provide significant challenges to successful completion. Although the Zena A-100 rig is to be used it is possible that specialists will be employed for the plug emplacement.
From the limited information available it appears that the plug will be located immediately below the M Eocene productive section in an 'open-hole' ie uncased setting and since the stated purpose is to isolate the downhole Cretaceous sequence it presumably requires a permanent 'cement' plug. That implies that the plug is most likely to be emplaced using a 'dump bailer' run into the well on wireline. Interestingly the A-100 'front-on' 13th Feb twitter photo shows a guy inspecting what appears to be a bailer ie the pipe fitted with spacers for guidance within well-casing. The âcustom-builtâ spec will include some integral mechanics and electronics eg logging-tools, and probable flexibility for ease of run-in.
As the plug is to be in 'open-hole' it is not possible to install a mechanical packer as a base for the 'cement', the most likely substitute being a bentonite or polymer-based thixotropic support plug emplaced during initial run-ins of the bailer. Only when that is confirmed in place and sufficiently gelled will the 'cement' plug be emplaced, that too requiring several downhole runs. In an open-hole setting 'squeeze-cementing' techniques, used to enhance an impermeable interface with the wellbore walls, are inapplicable so the 'cement' plug will most likely be extended up-hole for several metres to compensate for this.
The 'cement' composition will presumably have been designed using simulation testing based on all known downhole physical and chemical parameters. It may well include emplacement of several 'cements' each of different composition, in sequence. This would be necessary for example, if the plug location is within the M Eocene basal limestones or is to provide the dual function of shutting off a high water-inflow zone.
Even from this highly simplified account it should be evident that this is not a ârun of the millâ infallible procedure. However, failure of plug emplacement is invariably followed by further attempts until success is achieved.. As the 11.02.2020 RNS refers to rig âmobilisation within the next 30 daysâ and the 13th Feb photo tweet indicates rig and 'dump bailer' testing in progress, C-37 operations should be underway soon. After completion the well will be placed on test to achieve optimum production, anticipated to be in the 250-300bopd range (ref 12.12.2019 RNS), with stimulation an option for future enhancement.
AGEOS.
Jafarli Field C-37
Sun 14:10
Contrary to what some BB posts here have implied, the forthcoming bridge-plug operation at C-37 will have required thorough geotechnical planning and design, and may provide significant challenges to successful completion. Although the Zena A-100 rig is to be used it is possible that specialists will be employed for the plug emplacement.
From the limited information available it appears that the plug will be located immediately below the M Eocene productive section in an 'open-hole' ie uncased setting and since the stated purpose is to isolate the downhole Cretaceous sequence it presumably requires a permanent 'cement' plug. That implies that the plug is most likely to be emplaced using a 'dump bailer' run into the well on wireline. Interestingly the A-100 'front-on' 13th Feb twitter photo shows a guy inspecting what appears to be a bailer ie the pipe fitted with spacers for guidance within well-casing. The âcustom-builtâ spec will include some integral mechanics and electronics eg logging-tools, and probable flexibility for ease of run-in.
As the plug is to be in 'open-hole' it is not possible to install a mechanical packer as a base for the 'cement', the most likely substitute being a bentonite or polymer-based thixotropic support plug emplaced during initial run-ins of the bailer. Only when that is confirmed in place and sufficiently gelled will the 'cement' plug be emplaced, that too requiring several downhole runs. In an open-hole setting 'squeeze-cementing' techniques, used to enhance an impermeable interface with the wellbore walls, are inapplicable so the 'cement' plug will most likely be extended up-hole for several metres to compensate for this.
The 'cement' composition will presumably have been designed using simulation testing based on all known downhole physical and chemical parameters. It may well include emplacement of several 'cements' each of different composition, in sequence. This would be necessary for example, if the plug location is within the M Eocene basal limestones or is to provide the dual function of shutting off a high water-inflow zone.
Even from this highly simplified account it should be evident that this is not a ârun of the millâ infallible procedure. However, failure of plug emplacement is invariably followed by further attempts until success is achieved.. As the 11.02.2020 RNS refers to rig âmobilisation within the next 30 daysâ and the 13th Feb photo tweet indicates rig and 'dump bailer' testing in progress, C-37 operations should be underway soon. After completion the well will be placed on test to achieve optimum production, anticipated to be in the 250-300bopd range (ref 12.12.2019 RNS), with stimulation an option for future enhancement.
AGEOS.
morgendagen
17.02.2020 kl 12:21
4826
La oss tippe pris da? Oljepris opp Ă„ skurke selskap ned, denne bobla synker/synker.
0.130 i slutten av uken?
0.130 i slutten av uken?
Pe9s
17.02.2020 kl 14:01
4746
FAR100
17.02.2020 kl 14:29
5142
Ny emisjon
Redigert 21.01.2021 kl 04:09
Du mÄ logge inn for Ä svare
Svartsyn
17.02.2020 kl 16:55
4994
Inside kjĂžp av folk som vet mer enn oss, er nok et positivt trekk. De vil nok ikke brenne penger...
Redigert 21.01.2021 kl 04:09
Du mÄ logge inn for Ä svare
De har ikke penger til drift. Blir vel en emisjon i mÄneden fremover dersom de ikke fÄr igang C-37 og med det litt cash flow.
Redigert 21.01.2021 kl 04:09
Du mÄ logge inn for Ä svare
morgendagen
17.02.2020 kl 17:17
4962
Emisjon, emisjon er nĂ„ 577,072,921 aksjer som kan sirkuleres. đ dette er jo Titanic v2.
Redigert 21.01.2021 kl 04:09
Du mÄ logge inn for Ä svare
Pe9s
17.02.2020 kl 17:45
4930
Det er sant. Blir spennende Ă„ se hvor aksjekursen er om noen fĂ„ uker. đ
Redigert 21.01.2021 kl 04:09
Du mÄ logge inn for Ä svare
lady
17.02.2020 kl 18:07
4908
While Zenith Energy currently does not wish to communicate on âthis acquisition in West Africa,â the Calgary-based company will need to churn out nearly 1,000 barrels a day after completing a rehabilitation programme that it wants to carry out with local stakeholders.
Andrea Cattaneo, CEO since 2008, gave Jeune Afrique Business+ the details on the companyâs ambitions in Africa. Zenith will target assets that have been ignored by majors. The junior has a more agile cost structure that can make these assets profitable. The company will also only specialise in production, leaving behind exploration activities.
The targeted markets are in French-speaking Africa (Cameroon, Congo and Gabon), which, according to Cattaneo, share âstable political systems and are incredibly attractive for the oil industry.â
Zenith wants to privilege oil, which is more attractive than natural gas from a logistical perspective, even if the firm is not excluding operating small gas fields to generate power (gas to power). The company also needs to quickly add LNG assets to its portfolio. Without indicating any specifics, Andrea Cattaneo said there is a âsix-monthâ deadline for this energy source. He adds that, from among the countries in question, Angola âoffers a very favourable environmentâ with all its open-market reforms.
Based in Calgary, Canada, Zenith Energy operates and is listed in London. It also has offices in Italy and Azerbaijan where its main assets are currently located. Zenith has been doing business in Azerbaijan since 2016 via a rehabilitation and production contract with the State Oil Company of the Azerbaijan Republic (SOCAR), the countryâs national oil company, for a field containing 30.6 million barrels. In Italy, several gas fields are currently in production. In all, 200 people are working in the two countries where revenue totalled CA$6.6 million in 2019.
Its shift to Africa dates back to the summer of 2018 during initial prospecting in the Congo. Since then, the company has strengthened its position with the purchase in December 2019 of Anglo African Oil&Gas Congo, the subsidiary of Anglo African Oil&Gas. Zenith also recruited two African consultants: Bienvenu Briss Aleba, from Congoâs SNPC, and AndrĂ©-Brice Boumbendje, Gabonâs previous OPEC representative and former government advisor.
Andrea Cattaneo also announced that both the operations and management teams would be growing. Though listed on the London stock exchange and currently advised by Novum Securities, represented by Charlie Brook-Partridge and Hugh McAlister, and Peterhouse Capital (Lucy Williams and Charles Goodfellow), Zenith is looking into Lagos and Cape Town where it would have access to new consultants focused on Africa, according to our sources.
Sign in to start talking
Andrea Cattaneo, CEO since 2008, gave Jeune Afrique Business+ the details on the companyâs ambitions in Africa. Zenith will target assets that have been ignored by majors. The junior has a more agile cost structure that can make these assets profitable. The company will also only specialise in production, leaving behind exploration activities.
The targeted markets are in French-speaking Africa (Cameroon, Congo and Gabon), which, according to Cattaneo, share âstable political systems and are incredibly attractive for the oil industry.â
Zenith wants to privilege oil, which is more attractive than natural gas from a logistical perspective, even if the firm is not excluding operating small gas fields to generate power (gas to power). The company also needs to quickly add LNG assets to its portfolio. Without indicating any specifics, Andrea Cattaneo said there is a âsix-monthâ deadline for this energy source. He adds that, from among the countries in question, Angola âoffers a very favourable environmentâ with all its open-market reforms.
Based in Calgary, Canada, Zenith Energy operates and is listed in London. It also has offices in Italy and Azerbaijan where its main assets are currently located. Zenith has been doing business in Azerbaijan since 2016 via a rehabilitation and production contract with the State Oil Company of the Azerbaijan Republic (SOCAR), the countryâs national oil company, for a field containing 30.6 million barrels. In Italy, several gas fields are currently in production. In all, 200 people are working in the two countries where revenue totalled CA$6.6 million in 2019.
Its shift to Africa dates back to the summer of 2018 during initial prospecting in the Congo. Since then, the company has strengthened its position with the purchase in December 2019 of Anglo African Oil&Gas Congo, the subsidiary of Anglo African Oil&Gas. Zenith also recruited two African consultants: Bienvenu Briss Aleba, from Congoâs SNPC, and AndrĂ©-Brice Boumbendje, Gabonâs previous OPEC representative and former government advisor.
Andrea Cattaneo also announced that both the operations and management teams would be growing. Though listed on the London stock exchange and currently advised by Novum Securities, represented by Charlie Brook-Partridge and Hugh McAlister, and Peterhouse Capital (Lucy Williams and Charles Goodfellow), Zenith is looking into Lagos and Cape Town where it would have access to new consultants focused on Africa, according to our sources.
Sign in to start talking
Redigert 21.01.2021 kl 04:09
Du mÄ logge inn for Ä svare