Maha Energy AB (publ)

Biblioteksgatan 1
SE-111 46 Stockholm
www.mahaenergy.ca

Press release
Stockholm
July 25, 2018

Maha Energy AB (publ) (Maha or the Company) Announces Update on GTE-3
Workover in the Tie Field.

The Company is pleased to announce the dual recompletion of two zones in the
GTE-3 well is now complete by use of a long production string for the Sergi
formation (the long string) and a short production string for the Agua
Grande (AG or the short string).

Sergi - Long String

The Sergi formation has, on its own, initially tested at 960 BOPD, 218 BWPD
and 261 MSCFPD of gas with the assistance of the newly acquired jet pump and
will now be placed on production. The Sergi long string will continue to be
produced until the AG short string is ready to be tested and put on stream
(see below).

Agua Grande- Short String

Additional purpose built equipment is being brought to the Tie field to test
and place the Agua Grande short string on stream. Once the Agua Grande is
tested and ready for production, the surface pumping equipment will be
properly calibrated and both zones will then be produced simultaneously.

Jonas Lindvall, managing director of Maha Energy AB said: This is a good
example of the Maha Energy business model: applying state of the art
technology to under exploited resources to increase production. Here, a
very custom-tailored solution - a single hydraulic triplex jet pump driving a
dual completion in a single well - propelled a previously dead-well to become
an important producer. The initial results of the long string exceed our
expectations.