Aker Offshore Wind - Trigger liste
Er det noen som har noe å legge til her, gi beskjed
Aker Offshore Wind (AOW) AKH har 51% eierskap - 1.5 GW portfolio of development projects
- Emisjon til drift, hvis de ikke får en kontrakt de kan kjøre emisjon på snart
- Lisensrunden i Skottland - Linsens ventet å bli tildelt H1 2022 - Scotwind (new submission deadline in Mid-July - søknadsfristen 16. juli) - aims to provide 10 GW in new installed capacity - aims to develop more than 500 MW in gross capacity. Lease award is expected H1 2021, FID in 2028 and commercial operation date in 2030.
https://www-energyvoice-com.cdn.ampproject.org/c/s/www.energyvoice.com/renewables-energy-transition/wind/337342/ocean-winds-scotwind/amp/
«Røkke-selskapet er sammen med Mainstream Renewable Power valgt som foretrukket budgiver for å kjøpe en initiell 50 prosent andel av et flytende havvindprosjekt i Japan»
https://e24.no/boers-og-finans/i/5G3Wjb/aker-offshore-wind-favoritt-til-havvindprosjekt-i-japan
- Korea - Sites allocated. Electricity business license. H2 2021
- Ocean Winds and Aker Offshore Wind Announce Partnership for Floating Offshore Wind Energy in Scotland
- Lisensrunden i California juni 2022 (New bill would set state target to build hundreds of tall turbines in the Pacific Ocean by 2030). Lease auction Q2/Q3 2022.
- AOW owns a share of the project development company KF Wind, The project has a total potential capacity of 1,500 MW with electricity production from first phase of 500 MW from 2025-2026
- AOW announced establishment of a 50/50 JV with Swedish company Hexicon to explore floating wind opportunities in Sweden. Sweden has ambitious renewables ambitions and may become a large floating offshore wind market. Public consultation for 3 areas. Seabed survey permits submitted for 3 sites.
https://www.hexicon.eu/projects/
Vindkraftsparken Dyning
https://www.hexicon.eu/wp-content/uploads/2021/06/Dyning.pdf
Vindkraftsparken Mareld
https://www.hexicon.eu/wp-content/uploads/2021/06/Mareld.pdf
Vindkraftsparken Kultje
https://www.hexicon.eu/wp-content/uploads/2021/06/Kultje.pdf
--------------
- The Redwood Coast Offshore Wind Project (RedCOW) was established in 2018 as a consortium with Aker Solutions and EDP Renewables (now Ocean Winds)
Project has the potential to be a flagship project for the state, with an initial capacity of 150 MW by 2025. FID is scheduled for 2024, while the commercial operation date is expected in 2025
- AOW og Aker Horizons har signert en samarbeidsavtale med Statkraft, Europas største produsent av fornybar energi, fornybarprodusent, for å utforske muligheter for havvind på norsk kontinentalsokkel.
- The Norwegian government has opened two areas for offshore wind development with a potential capacity of about 4.5 GW: Sørlige Nordsjø II and Utsira Nord. Forventet at lisenser blir tildelt H1 2022.
- Børs meldt 14.6.2021: The partnership - in which bp, Statkraft and Aker Offshore Wind will each hold a 33.3% share - will pursue a bid to develop offshore wind power in the Sørlige Nordsjø II (SN2) licence area
«Under talen fortalte Tina Bru at det vil bli gitt konsesjoner til to eller tre aktører i Sørlige Nordsjø II, som skal velges ut etter en kvalifiseringsrunde og en auksjon.
Bru har som mål at auksjonene skal annonseres første kvartal i 2022»
«I Utsira Nord, der det skal bygges flytende havvind, vil det åpnes for tre utbygginger på opp til 500 megawatt hver»
https://e24.no/det-groenne-skiftet/i/OQwbxE/vil-aapne-flere-omraader-for-havvind
- Project Sønnavindar is located in Sørlige Nordsjø II - opened for license applications starting January 2021 - Pending development of the government framework,
FID is expected in 2024 - phased development between 2026 and 2029. AOW target to develop 1,200 MW. AOW currently takes an architect role for the total development concepts, including electrification infrastructure, and may set up separate structures for scope outside of the wind farm itself
- Project Vestavindar is located in Utsira Nord - Pending development of the government framework, FID is expected in 2024 and commercial operation date is expected in 2026 - AOW targets to develop 500 MW of gross installed capacity. AOW currently takes an architect role for the total development concepts, including electrification infrastructure, and may set up separate structures for scope outside of the wind farm itself
Principle Power (ikke børs notert) 47% eierskap - Aker, via subsidiary Vestavindar Offshore Wind, funded by Aker Offshore Wind's
- børsnotering av Principle Power
- konsesjoner i Norge (denne sommeren?),
- Samarbeid med Statskraft og svenskene.
- More than 100 MW installed capacity by 2022
- World’s first 8.4 MW floating turbine installed offshore in Portugal
https://www.principlepowerinc.com/
Info fra prospekt til Aker Horizons når selskapet flyttes til hovedindeksen 21.5.2021:
https://static1.squarespace.com/static/5f871df7bb429b52ac77d186/t/60a632df064ee75be0ce520d/1621504756046/Aker+Horizons+Prospectus.pdf
Aker Offshore Wind kan handles på USA børsen:
https://www.otcmarkets.com/stock/AKOWF/quote
Aker Offshore Wind (AOW) AKH har 51% eierskap - 1.5 GW portfolio of development projects
- Emisjon til drift, hvis de ikke får en kontrakt de kan kjøre emisjon på snart
- Lisensrunden i Skottland - Linsens ventet å bli tildelt H1 2022 - Scotwind (new submission deadline in Mid-July - søknadsfristen 16. juli) - aims to provide 10 GW in new installed capacity - aims to develop more than 500 MW in gross capacity. Lease award is expected H1 2021, FID in 2028 and commercial operation date in 2030.
https://www-energyvoice-com.cdn.ampproject.org/c/s/www.energyvoice.com/renewables-energy-transition/wind/337342/ocean-winds-scotwind/amp/
«Røkke-selskapet er sammen med Mainstream Renewable Power valgt som foretrukket budgiver for å kjøpe en initiell 50 prosent andel av et flytende havvindprosjekt i Japan»
https://e24.no/boers-og-finans/i/5G3Wjb/aker-offshore-wind-favoritt-til-havvindprosjekt-i-japan
- Korea - Sites allocated. Electricity business license. H2 2021
- Ocean Winds and Aker Offshore Wind Announce Partnership for Floating Offshore Wind Energy in Scotland
- Lisensrunden i California juni 2022 (New bill would set state target to build hundreds of tall turbines in the Pacific Ocean by 2030). Lease auction Q2/Q3 2022.
- AOW owns a share of the project development company KF Wind, The project has a total potential capacity of 1,500 MW with electricity production from first phase of 500 MW from 2025-2026
- AOW announced establishment of a 50/50 JV with Swedish company Hexicon to explore floating wind opportunities in Sweden. Sweden has ambitious renewables ambitions and may become a large floating offshore wind market. Public consultation for 3 areas. Seabed survey permits submitted for 3 sites.
https://www.hexicon.eu/projects/
Vindkraftsparken Dyning
https://www.hexicon.eu/wp-content/uploads/2021/06/Dyning.pdf
Vindkraftsparken Mareld
https://www.hexicon.eu/wp-content/uploads/2021/06/Mareld.pdf
Vindkraftsparken Kultje
https://www.hexicon.eu/wp-content/uploads/2021/06/Kultje.pdf
--------------
- The Redwood Coast Offshore Wind Project (RedCOW) was established in 2018 as a consortium with Aker Solutions and EDP Renewables (now Ocean Winds)
Project has the potential to be a flagship project for the state, with an initial capacity of 150 MW by 2025. FID is scheduled for 2024, while the commercial operation date is expected in 2025
- AOW og Aker Horizons har signert en samarbeidsavtale med Statkraft, Europas største produsent av fornybar energi, fornybarprodusent, for å utforske muligheter for havvind på norsk kontinentalsokkel.
- The Norwegian government has opened two areas for offshore wind development with a potential capacity of about 4.5 GW: Sørlige Nordsjø II and Utsira Nord. Forventet at lisenser blir tildelt H1 2022.
- Børs meldt 14.6.2021: The partnership - in which bp, Statkraft and Aker Offshore Wind will each hold a 33.3% share - will pursue a bid to develop offshore wind power in the Sørlige Nordsjø II (SN2) licence area
«Under talen fortalte Tina Bru at det vil bli gitt konsesjoner til to eller tre aktører i Sørlige Nordsjø II, som skal velges ut etter en kvalifiseringsrunde og en auksjon.
Bru har som mål at auksjonene skal annonseres første kvartal i 2022»
«I Utsira Nord, der det skal bygges flytende havvind, vil det åpnes for tre utbygginger på opp til 500 megawatt hver»
https://e24.no/det-groenne-skiftet/i/OQwbxE/vil-aapne-flere-omraader-for-havvind
- Project Sønnavindar is located in Sørlige Nordsjø II - opened for license applications starting January 2021 - Pending development of the government framework,
FID is expected in 2024 - phased development between 2026 and 2029. AOW target to develop 1,200 MW. AOW currently takes an architect role for the total development concepts, including electrification infrastructure, and may set up separate structures for scope outside of the wind farm itself
- Project Vestavindar is located in Utsira Nord - Pending development of the government framework, FID is expected in 2024 and commercial operation date is expected in 2026 - AOW targets to develop 500 MW of gross installed capacity. AOW currently takes an architect role for the total development concepts, including electrification infrastructure, and may set up separate structures for scope outside of the wind farm itself
Principle Power (ikke børs notert) 47% eierskap - Aker, via subsidiary Vestavindar Offshore Wind, funded by Aker Offshore Wind's
- børsnotering av Principle Power
- konsesjoner i Norge (denne sommeren?),
- Samarbeid med Statskraft og svenskene.
- More than 100 MW installed capacity by 2022
- World’s first 8.4 MW floating turbine installed offshore in Portugal
https://www.principlepowerinc.com/
Info fra prospekt til Aker Horizons når selskapet flyttes til hovedindeksen 21.5.2021:
https://static1.squarespace.com/static/5f871df7bb429b52ac77d186/t/60a632df064ee75be0ce520d/1621504756046/Aker+Horizons+Prospectus.pdf
Aker Offshore Wind kan handles på USA børsen:
https://www.otcmarkets.com/stock/AKOWF/quote
Redigert 17.12.2021 kl 10:38
Du må logge inn for å svare
KalleIvars
01.08.2021 kl 23:41
5152
Yostock
01.08.2021 kl 20:13
5330
Heldigvis har Aker lyktes og har både kapital og utbytte. AoW sin tid kommer, med Principle Power og sterke samarbeidspartere rundt om i verden er det ikke umulig at Aker konsernet kan dra i land dette. Utålmodighet gir somregel ikke kjempe profitt på børs. Derimot bør en tenke minst 5 år frem i tid og om selskapet har livets rett.
Ja, det kan være lurt å bruke den lange ventetiden til,å bygge opp rikelig med kapital i olje eller container. Så kan en vurdere en inngang langt inn i fremtiden før det tar av. Samtidig er det stor konkurranse og garantert at ikke alle vil lykkes. Vil eventuelt være lurt å velge de som har kommet lengst og ikke minst tjener penger og betaler utbytte. Ingen som er på børs for å redde verden.
Yostock
01.08.2021 kl 17:16
5514
Slettet brukerskrev Equinor er vel også et godt stykke foran Aker systemet når det gjelder fornybart?
Da har man noen år å kjøpe seg opp på. En dag vil det grønne skiftet skje enten man vil eller ikke. Så gjelder det å ta noen valg om man vil være med fra starten eller kjøpe eh inn om noen år. Det kommer nok til å skje betydelige ting på klimafronten dette tiåret.
Men ja har man dårlig tid så kan man jo bare trade etter oljeprisene, årsrapporter med overskudd eller container pågangen.
Men ja har man dårlig tid så kan man jo bare trade etter oljeprisene, årsrapporter med overskudd eller container pågangen.
Redigert 01.08.2021 kl 17:18
Du må logge inn for å svare
He he de fleste shorter under 0.5. Og det gjelder akh også. Nå når akh er priset under Main pris alene vil det bli morsomt fremover.
Skalleknarp
01.08.2021 kl 14:32
5686
Slettet brukerskrev Short?
Bare et selskap som har synlig short og de har hatt den ganske lenge. Siste tids oppgang og tilbakekjøp av egne aksjer gjør vel at det ikke vil synke noe særlig… Det må jo koste en del å låne i lengden også? Det er mye skriving om hav vind både pluss og minus, men bare det kommer i gang prosjekter så er jeg sikker på at ballen vil rulle og kursen stikke nordover pga. alle skal få og AOW vil vinne prosjekter…🤠
Redigert 01.08.2021 kl 15:36
Du må logge inn for å svare
Slettet brukerskrev Short?
Spør du meg? Nei, jeg shorter ikke, men jeg ser aow er på lista til Finanstilsynet over de mest shorta aksjene på Oslo børs.
Slettet brukerskrev Equinor er vel også et godt stykke foran Aker systemet når det gjelder fornybart?
Short?
Equinor er vel også et godt stykke foran Aker systemet når det gjelder fornybart?
https://e24.no/det-groenne-skiftet/i/JEezKR/analytiker-vil-ta-aarevis-foer-equinor-tjener-paa-fornybarsatsingen
Her må en nok smøre seg imed tålmodighet når det gjelder inntjening
Her må en nok smøre seg imed tålmodighet når det gjelder inntjening
Frodon
31.07.2021 kl 21:42
5940
KalleIvars skrev Lørdagsfilmen: https://youtu.be/hWy7ls0egpg
Hvor mye kan et slikt selskap bli verdt, hvis de eks får bli med på utbyggingen av Scotwind? Har du sett noen tall på potensiell inntjening på slike prosjekter?
Yostock
31.07.2021 kl 21:38
5936
KalleIvars skrev Lørdagsfilmen: https://youtu.be/hWy7ls0egpg
Takk for deling KalleIvars :)
At Mainstream og scatec skal være så like, der førstnevnte så utrolig uforståelig er langt mer underpriset, er vel noe trådstarter har konkludert med selv, i en monolog med seg selv😅
Redigert 31.07.2021 kl 16:38
Du må logge inn for å svare
Yostock
31.07.2021 kl 12:22
6264
Hentet fra hjemmesiden til AoW. De er godt posisjonert i Sør Korea.
SOUTH KOREA
The South Korean Government’s IES 2030 plan targets an increase in renewable power generation from 8% to 20% by 2030 and 30-35% by 2040.
Aker Offshore Wind owns a share of the project development company KF Wind which has secured one out of five Memorandum of Understandings (MoUs) with Ulsan City and three potential sites for development.
The project has a total potential capacity of 1,500 MW with electricity production from first phase of 500 MW from 2025-26, to be developed in a strong consortium with Ocean Winds and local partner, WPK.
SOUTH KOREA
The South Korean Government’s IES 2030 plan targets an increase in renewable power generation from 8% to 20% by 2030 and 30-35% by 2040.
Aker Offshore Wind owns a share of the project development company KF Wind which has secured one out of five Memorandum of Understandings (MoUs) with Ulsan City and three potential sites for development.
The project has a total potential capacity of 1,500 MW with electricity production from first phase of 500 MW from 2025-26, to be developed in a strong consortium with Ocean Winds and local partner, WPK.
quest
31.07.2021 kl 09:55
6371
Da ser det ut for at det er litt substans i stigningen. Vil antageligvis stige litt til framover.
Frodon
31.07.2021 kl 08:31
6417
AKH gikk litt opp fordi deres 75% eierandel i Mainstream ikke er priset inn i aksjen. Mainstream alene er verdt mer enn det hele AKH er priset til. Dvs de som kjøper aksjer i AKH, får eks aksjer i AOW med gratis på kjøpet ;)
https://finansavisen.no/forum/thread/130925/view/3656555?legacy=0#__top
Mainstream kan sammenlignes med Scatec:
https://finansavisen.no/forum/thread/137618/view/3657218?legacy=0
https://finansavisen.no/forum/thread/130925/view/3656555?legacy=0#__top
Mainstream kan sammenlignes med Scatec:
https://finansavisen.no/forum/thread/137618/view/3657218?legacy=0
TraderMom
30.07.2021 kl 22:40
6607
Kan der være drahjelp fra Danske Banks kjøpsanbefaling og analyse av AKH? AKH gikk 6% i dag på rød børs da den ble kjent
Yostock
30.07.2021 kl 22:05
6670
SongaMoenBergen skrev Ligger i en teknisk utbunning og rekyl opp er vel ventet.
2022 blir året. Bare å laste opp i 2021.
SongaMoenBergen
30.07.2021 kl 15:09
6895
SongaMoenBergen skrev Har anbud på britisk sektor inne som er realistiske å få.
Ligger i en teknisk utbunning og rekyl opp er vel ventet.
SongaMoenBergen
30.07.2021 kl 15:06
6895
SongaMoenBergen skrev Har falt 30 prosent siste 3 mnd ein del og hente inn at
Har anbud på britisk sektor inne som er realistiske å få.
SongaMoenBergen
30.07.2021 kl 15:03
6884
SongaMoenBergen skrev Kepler har lursmåål 16 fra april 2021
Har falt 30 prosent siste 3 mnd ein del og hente inn at
Jarnar
27.07.2021 kl 15:51
7436
Garantiprisen blir alltid offentliggjort sammen med vinnerne av lisens-konkurransen. Garantiprisen blir lagt fram i 2012-verdi - trolig for å gjøre ulike prosjekter sammenlignbare over tid. Equinor fikk tilslag på Doggerbank-utbyggingen med partnere. Der var garantiprisen runt 40 pund per mwh, ganske lavt selv med oppjustering fra 2012-nivå til dagens. Det var bunnfast havvind og kostnadene har sunket kraftig, ikke minst takket være de nye kjempeturbinene på 14 MW.
Det er meget bra at AOW kan dra veksler på Aker-systemet og løsningene der.
Det er meget bra at AOW kan dra veksler på Aker-systemet og løsningene der.
Frodon
27.07.2021 kl 13:16
7490
Jeg håper Cognite teknologi kan brukes i disse prosjektene, for å ha et økonomisk forsprang på konkurrentene ;) Aker systemet har vært helt rå på å få lav kost pris pr fat på olje i AkerBP, så håpet er at de klarer noe slikt her. Noen biddere kan være langsiktig og tenke at de får mindre marginer her nå, i håp om å få noen av de andre feltene seinere med høy margin. Det virker i hvert fall som om mange nye selskap er desperate etter å få kontrakter.
Får håpe garanti prisen blir "høy nok" til å levere avkastning. Pleier UK å oppgi garanti prisen til markedet når selskap blir valgt til utbyggingen?
Får håpe garanti prisen blir "høy nok" til å levere avkastning. Pleier UK å oppgi garanti prisen til markedet når selskap blir valgt til utbyggingen?
Jarnar
27.07.2021 kl 11:55
7524
Hvordan AOW tenker omkring sitt bud er ikke tilgjengelig kunnskap. Men jeg har ikke inntrykk av at Røkkes filosofi er underbud. Ting skal stå på egne bein. Jeg vil tro at AOW og partner leverer et bud med en viss profittmargin, og ikke noe dumping-prosjekt. Det svarer seg i lengden. Vil noe 'bidders' hive penger ut vinduet - ikke godt å si. AOW har bud på 3 av 15 lisenser, med gode teknologiske løsninger bør de ha en reell mulighet. Det er nøkkelen her.
Garantipris er metoden de bruker i UK. På Dudgeon fikk Equionor en veldig god garantipris, og den lisensen er rene gullgruven for selskapet. Men konkurransen vil nok gi mer reelle priser i marknaden i samsvar med kostnader.
Garantipris er metoden de bruker i UK. På Dudgeon fikk Equionor en veldig god garantipris, og den lisensen er rene gullgruven for selskapet. Men konkurransen vil nok gi mer reelle priser i marknaden i samsvar med kostnader.
Redigert 27.07.2021 kl 11:58
Du må logge inn for å svare
Frodon
27.07.2021 kl 11:07
7492
Det store spørsmålet er jo lønnsomheten på slike prosjekt, når så mange aktører ønsker å bygge ut feltene. Da tenker du at myndighetene i UK skal subsidiere mellomlegget med høyere garantipris? Selv om det er såpass mange som har søkt? Myndighetene vil vell ha alt billigst mulig? Tviler på at prosjektene blir billigere å bygge ut en «gamle» måten. Så et sted må lønnsomheten komme ifra
Alt med finansieringen er jeg enig i ;)
Alt med finansieringen er jeg enig i ;)
Jarnar
27.07.2021 kl 10:32
7526
Modellen i UK har vært en garantipris som utbygger får betalt for strømmen en periode, normalt er vel 15 år. Dersom markedsprisen ligger over garantipris, får myndighetene det overskytende, ved pris lavere enn garantipris blir utbygger subsidiert med mellomlegget. For flytende havvind må man trolig regne med garantipriser noe over markedspris.
Det viktige for AOW er å få tilslag - finansiering er underordnet. Emisjon er nødvendig en eller annen gang, og lånefinansiering må inngå i utbygginger. Alt blir mer gunstig når man har konkrete prosjekter å fokusere på. Da er investorene villig til å bla opp i emisjoner. Poenget er at selskapet må fremstå som veldrevet og framtidsrettet. Havvind blir trolig langt større enn vi kan forestille oss i dag, jfr akselrerende klimaproblemer.
Det viktige for AOW er å få tilslag - finansiering er underordnet. Emisjon er nødvendig en eller annen gang, og lånefinansiering må inngå i utbygginger. Alt blir mer gunstig når man har konkrete prosjekter å fokusere på. Da er investorene villig til å bla opp i emisjoner. Poenget er at selskapet må fremstå som veldrevet og framtidsrettet. Havvind blir trolig langt større enn vi kan forestille oss i dag, jfr akselrerende klimaproblemer.
Redigert 27.07.2021 kl 10:33
Du må logge inn for å svare
Mr Strange
26.07.2021 kl 18:21
7816
Er det deffinert at 1 område kun kan gå til ett annbud..det er definert som 100k pr m2..og de fleste har lagt inn tilbud i mange områder..så kan fort hende at ett område består av flere ..uten at jeg vet sikkert
Redigert 26.07.2021 kl 19:36
Du må logge inn for å svare
Frodon
26.07.2021 kl 16:06
7866
Hva tror du? Slik jeg forsto det på noen av de 15 områdene, var noen selskap villig til å ta alle kostnadene ved utbyggingen selv, bare de fikk inntektene fra områdene de neste 30 årene. Men hvis de blir garantert å få inntektene over lang tid, vil jeg tro at prisene på strømmen blir satt opp for å hente inn kostnadene på utbyggingen? Og da blir dette dyrt for sluttbruker? Har du sett hvordan dette er gjort på andre områder? Hvis AOW må ta alle kostnadene selv på utbyggingen, hvordan tenker de å finansiere dette hvis de ikke får støtte? Obligasjonslån fra Aker + emisjon?
KalleIvars
26.07.2021 kl 15:44
7768
En kontrakt er mellom to eller flere parter. Den regulerer pris og andre forhold. Dersom en av partene ønsker å presse ned en signert avtale er det pr definisjon kontraktsbrudd.
Mange som vil inn, å håper prisen på aow skal ned. Tanken om at august og september historisk har vært svake måneder i aksjemarkedet preger aksjekursen i dag, men preger d aksjekursen i morgen? D er spørsmålet man bør stille seg😉
Mange som vil inn, å håper prisen på aow skal ned. Tanken om at august og september historisk har vært svake måneder i aksjemarkedet preger aksjekursen i dag, men preger d aksjekursen i morgen? D er spørsmålet man bør stille seg😉
Redigert 26.07.2021 kl 15:45
Du må logge inn for å svare
Tilbakejøpsprogramet til AOW holder kursen oppe.
Passerer vi kr 5.20 idag?
KalleIvars
23.07.2021 kl 12:27
4136
Aksjekursene går ikke i rette linjer. De går opp og ned over tid. Kan klart tjene penger/ akkumulere flere aksjer på den måten om man er heldig, men i d lange bildet skal aow opp til nye høyder synes det som flere mener🌞😎 https://finansavisen.no/nyheter/energi/2021/02/15/7626070/abg-tar-opp-dekning-av-to-rokke-nykommere-ser-80-prosents-oppside
Nye markeder popper også stadig opp for havvind: https://www.linkedin.com/posts/principle-power_floating-wind-energy-can-make-ireland-renewable-activity-6824300436204339200-gf7M
Nye markeder popper også stadig opp for havvind: https://www.linkedin.com/posts/principle-power_floating-wind-energy-can-make-ireland-renewable-activity-6824300436204339200-gf7M
Redigert 24.07.2021 kl 20:25
Du må logge inn for å svare
ScotWind har fått 74 søknader for 15 områder.
Svar på søknadene er ventet januar 2022.
Kilde: https://www.offshorewind.biz/2021/07/22/15-scotwind-areas-attract-74-offshore-wind-applications/
Svar på søknadene er ventet januar 2022.
Kilde: https://www.offshorewind.biz/2021/07/22/15-scotwind-areas-attract-74-offshore-wind-applications/
Tradinator
Nå er det traderne som styrer kursen. Tjener godt når kursen er opp 3-4% og så ned noen timer deretter med 3-4% Dette har pågått over lengre tid. Ser at Aker Horizon
kjører det samme løpet med sine selskap. Går det ene opp går det andre ned og omvendt.
Her er det mye penger å tjene for de som styrer dette. Skulle gjerne vært en flue på veggen her ja. Langsiktighet bør man holde seg unna her, for nå er det bare daglig trading som gir penger på bekostning av oss som dessverre kjøpte dyrt. Alle positive innlegg virker mot sin hensikt. Virker bedre for opptur om det bare legges inn negativt..
Nå er det traderne som styrer kursen. Tjener godt når kursen er opp 3-4% og så ned noen timer deretter med 3-4% Dette har pågått over lengre tid. Ser at Aker Horizon
kjører det samme løpet med sine selskap. Går det ene opp går det andre ned og omvendt.
Her er det mye penger å tjene for de som styrer dette. Skulle gjerne vært en flue på veggen her ja. Langsiktighet bør man holde seg unna her, for nå er det bare daglig trading som gir penger på bekostning av oss som dessverre kjøpte dyrt. Alle positive innlegg virker mot sin hensikt. Virker bedre for opptur om det bare legges inn negativt..
Yostock
23.07.2021 kl 11:33
3972
Gikk litt ned. Men bra aow kjøper tilbake egne aksjer. Er jo en lovende utvikling. Da de har bedre oversikt over utviklingen enn vi:)
Redigert 23.07.2021 kl 11:33
Du må logge inn for å svare
Tradinator
22.07.2021 kl 22:24
4188
Hmmm, det kan bli villt igjen. Godt å ha beholdt alt, kanskje var det bunnen vi skrapte denne uka.
bare meg
22.07.2021 kl 18:43
4330
Aow skal oppover nå med alle di nyhetene som har/kommer. Tror den kan gå over 6 imorgen 😉
Mr Strange
22.07.2021 kl 17:38
4409
1,1 mill i auksjonen i dag, ca 50% av hele dagsomsetningen..tenker short inndekning...
Husker for en del mnd siden så skjedde akkurat det samme, rett før en vill stigning
Husker for en del mnd siden så skjedde akkurat det samme, rett før en vill stigning
Jarnar
22.07.2021 kl 17:03
4442
Virker som at den svenske modellen følger en slags konsesjonsordning basert på enkeltsøknader innenfor de områder som er tiltenkt havvind. Det vil si det motsatte av auksjon/konkurranse som i Skottland. Hexicon/AOW får konsesjon dersom utredninger viser at fordelene ved utbygging er langt større enn de mulige ulempene for miljø, fiske og skipsfart. >I tillegg må konsortiet framvise teknologisk gode og sikre løsninger. Det er slik jeg oppfatter det svenske opplegget - noen andre syn på det?
Det ligger trolig an til sluttføring i peridoen 2025-2030 en gang, gjerne mot slutten av perioden. De snakker om 30 MW turbiner, og det vil nok ta noe tid før de er klar.
Det ligger trolig an til sluttføring i peridoen 2025-2030 en gang, gjerne mot slutten av perioden. De snakker om 30 MW turbiner, og det vil nok ta noe tid før de er klar.
ruda
22.07.2021 kl 16:45
4463
KalleIvars skrev https://twitter.com/AkerWind/status/1417890420307136519?s=19
AOW kommer fort til å stige til gamle høyder fremover. Kan være gunstig å gå inn i denne nå
Jarnar
22.07.2021 kl 16:44
4446
Sweden
Together with Aker Offshore Wind (AOW), Hexicon is developing multiple sites off the coast of Sweden, totaling several GW. With government plans for expanding the electricity grid far offshore and ambitious net zero commitments, AOW and Hexicon are positioned to leverage floating offshore wind opportunities in our home market.
Dyning
Mareld
Kultje
Together with Aker Offshore Wind (AOW), Hexicon is developing multiple sites off the coast of Sweden, totaling several GW. With government plans for expanding the electricity grid far offshore and ambitious net zero commitments, AOW and Hexicon are positioned to leverage floating offshore wind opportunities in our home market.
Dyning
Mareld
Kultje
KalleIvars
22.07.2021 kl 09:08
4606
Frodon
22.07.2021 kl 08:23
4588
Fra Q2 presentasjonen til Statskraft idag
«Statkraft planlegger netto investeringer i fornybar energi på opptil 13 milliarder årlig fremover. Utbyggingstakt og investeringsomfang vil avhenge av markedsutviklingen og vil bli tilpasset den finansielle kapasiteten og målet for rating»
Minner da om partnerskapet mellom AOW, Statskraft og BP
https://www.statkraft.no/nyheter/nyheter-og-pressemeldinger/arkiv/2021/bp-gar-sammen-med-aker-og-statkraft-om-norsk-havvindsatsing/
«Statkraft planlegger netto investeringer i fornybar energi på opptil 13 milliarder årlig fremover. Utbyggingstakt og investeringsomfang vil avhenge av markedsutviklingen og vil bli tilpasset den finansielle kapasiteten og målet for rating»
Minner da om partnerskapet mellom AOW, Statskraft og BP
https://www.statkraft.no/nyheter/nyheter-og-pressemeldinger/arkiv/2021/bp-gar-sammen-med-aker-og-statkraft-om-norsk-havvindsatsing/